The moment when you realize that if CDG/DDN MDU is put on TNSKs slot, the CDG half extended to KLK on one side and MTP (from ED) on the other and the DDN half extended to RMM, not only will it become a Shimla - Ooty connectivity, connecting to toy trains on both the sides but will also become a HW - RMM connectivity