1) Traffic survey
Traffic survey includes a detailed study of the traffic conditions in the area.
Traffic surveys are normally undertaken in conjunction with reconnaissance or preliminary engineering surveys so that the technical feasibility and relative costs of alternative proposals can be formulated. The traffic survey team should work in close cooperation with the engineering survey team. The survey team should visit all trade centres in the area and consult local bodies, state governments, and prominent citizens regarding trade and industry and propose the most suitable alignment for the new line.
The...
more... traffic survey team should make an assessment of the traffic likely to be carried by to the new line. While carrying out the survey, details of traffic likely to be offered by various government organizations, public bodies, or private enterprises should be gathered.
At the end of the survey, a report should be formulated by the officer-in-charge of the survey. The formation of the report is governed largely by the nature of the terms of reference and the investigations made. The traffic survey report should normally contain the following information:
(a) History of the proposal and terms of reference
(b) General description
(c) Potentials and prospects
(d) Industrial and economic development and traffic projections
(e) Population projection and volume of passenger traffic
(f) Existing rates and rates to be charged
(g) Location of route or routes examined, alternate routes, and possible extensions
(h) Station sites and their importance
(i) Train services, section capacity, and various alternative ways of increasing capacity
(j) Coaching earnings
(k) Goods earnings
(l) Working expenses and net receipts
(m) Engineering features
(n) Telecommunication facilities
(o) Financial appraisal
(p) Conclusions and recommendations
Source:
click here