""""South Western Railway’s chief PRO E Vijaya said they have told Southern Railway about their willingness to operate the train. “The decision on the timings will be taken by the railway board,” she said.""""""
Here SWR PRO is saying that SWR is willing to operate the train , but again the timings will be decided by RB. I can't get this point , normally the timings of the train would be decided by the concerned zonal railways then after the proposal will be sent to RB......seems something fishy again w.r.t this train.