Yes. Its near PER. But why shouldnt the train wait until it gets clearance? Is it necessary that it should skip the signal and proceed? Do the LPs need permission to skip the signal? I mean they have to inform that they are skipping the signal and proceeding. How would the controller know the train has skipped the signal and at which signal it has stopped after that slow skip of the previous signal?