Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat May 4 14:26:31 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 3184830
Posted: Mar 08 2018 (22:46)

42 Responses
Last Response: Jun 22 2022 (12:18)
7 Followers
General Travel
23264 views
35

★★★
Mar 08 2018 (22:46)   JBP/Jabalpur (7 PFs)
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Entry# 3184830            Tags  
1 compliments
Very Informative. Bookmarked.
This is a somewhat technical post, so apologies if someone gets bored to death while reading it :P :P
...
The figure that you see in Image 1 is called as a trapezoidal curve. this is a rather simplistic depiction of the velocity-time curve in traction, and will help me highlight a rather important point related to traction energy consumption
consider a train, going
...
more...
from station A to B which are separated by 20 Km. Assume that the loco in question takes about 2 Km of distance to reach to full speed, and one Km to brake from MPS to zero speed at station. That means, for a distance of 17 Km (85% of the train's distance covered) the train is operating at MPS. assuming that frictional losses are negligible, you'll realize that for most of the journey, the train is in the part of the curve that is shown between T2 and T3 in the figure. since by Newton's first law we know that things in motion tend to stay in motion :P, if you ignore the frictional losses you realize that no energy is required by the train in time duration between T2 and T3. In reality we do have friction and train resistance loss, but they are quite small when compared to the energy required in time duration between T=0 and T1. Upto time T1 train has to first overcome inertia, accelerate from rest and then keep accelerating till it reaches MPS. this is where bulk of the energy required for locomotion is used, and beyond T1 and especially after T2, very less energy is required. in fact, in 3 phase locos, during the last phase i.e. braking, energy consumption is negative i.e. you return energy back to grid.
Now, not all trains have non stop runs of 20 Kms. passenger trains will have halts every 5-10 Kms or so, and suburban trains i.e. EMU's have halts every Km or so. As you might have realized, these trains require substantially higher power to move the same amount of load as they spend most of their time in 0 to T1 phase, and barely have time to coast as their schedule often don't permit them to go for lazy braking.
on other hand, fright trains, once in motion, can easily travel long distances without stopping. even when halted for OT/crossing, the time spent waiting is so much that they usually turn of their blowers after some time, thereby having very small losses when stationary. hence, even though quite heavy, freights actually require lesser amount of energy to move the same amount of load due to their motion characteristics
this whole "energy required to move a specific load per unit distance" is called SEC or Specific Energy Consumption, and is a very useful metric to see how energy consumption varies across pass and freight sector.
in the Image 2, you can clearly see how the SEC values for freight are almost one third of their corresponding values in passenger operation. in other words, you could say that over a given distance, a passenger train of 1500 tonnes (a full length ICF rake weighs this much) will take same amount of energy as a freight train of 4500 tonnes. many freight, like container or empty BOXN/BCN rakes weight much less than that, so you need less energy overall to operate them than you need to operate passenger trains, hence in newly electrified sections where some TSS are still under construction, preference is usually given to freight trains rather passenger ones in the beginning.
...
Source:
Image 1: click here
Image 2: click here
...
further reading (for those interested): click here (this is from BL Theraja's book A textbook on electrical technology)
...
tagged it under JBP, for its their RF's who are wondering about this for quite some time now :P if anyone has any objection to that, please tell me, I'll remove it.

Translate to English
Translate to Hindi

15 Public Posts - Thu Mar 08, 2018

19 Public Posts - Fri Mar 09, 2018

2 Public Posts - Sat Mar 17, 2018

1 Public Posts - Sun Mar 18, 2018

5787 views
0

Jun 17 2018 (16:37)
Rishi Trivedi   1570 blog posts
Re# 3184830-38              
Awesome Explanation !
You are an Engineering Student ?
Translate to English
Translate to Hindi

1 Public Posts - Mon Jul 16, 2018

1 Public Posts - Thu Jul 19, 2018

1 Public Posts - Fri Jul 20, 2018

1 Public Posts - Wed Jun 22, 2022

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy