The JHANSI-KHAJURAHO section is not electrified till date. Because of this the traon on this section Jhansi to Khajuraho requires a Diesel WDM engine attached /detached at Jhansi on both direction. The distance between Jhansi and Khajoraho is about 201 kms. If this Jhansi khajurako section is electrified then a single electric WAP 4/7 can pull the train upto Khajuraho/delhi on both direction thereby reducing the travelling time and saving OIL. Railways must consider this suggestion in the forth coming budget of 2018.