Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed Apr 24 22:44:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 2906873
Posted: Dec 19 2017 (16:52)

12 Responses
Last Response: Nov 30 2018 (14:30)
Info Update
26651 views
27

★★★
Dec 19 2017 (16:52)   TK/Tumakuru (Tumkur) (5 PFs)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Entry# 2906873            Tags   Past Edits
Finally :) ..... Finallyyyyyy :) ...... The work has started :)
-
-
After joining IRI, the first ever new station I visited was on the Tumakuru - Rayadurga new line last Dec /blog/post/2094512. A year since then, I have been waiting to see the work start from TK side too.
-
...
more...

SWR website gave the info that work is on from this side too. So I set out to find out what work has started.
Seeing the IRI atlas I was unable to tell where exactly the line deviated after TK.
So I set out to Heggere station. There I got down and started asking people whether any rail line is being built here. All of them asked me to turn around and look at the doubling work going on :) (Pic 7). No No... Not that... A line to Koratagere, Madhugiri.... I asked. But no one knew......
-
So I walked off to the highway and started walking back to Tumakuru city hoping to glimpse some work. On the train, after TK I did look out after TK on the right, but no work could be found.
Now after walking a Km or so... I gave up and stood by the side to wait for an auto to go back to the city. I got one and was going back when I saw some pillar construction work being done. I asked the auto to stop and got off. And then I saw one side the pillar work was done and the other side some workers were busy. And then when I asked, I got the answer I waiting for so long.
-
* Yes, this was a RUB for the new line. The RUB across Tumakuru-Honnavara NH.
* Another major RUB across the 6 lane Tumakuru-Hubballi NH was also going on.
* Further some 10 more minor bridges are under construction.
* And the work of land levelling was also going on some 10 Kms from here at the first station from this side - Oorukere.
* Here after this RUB work, the land levelling will begin.
* There will be the bifurcation - one worker pointed. And sure enough I could see the track - Pic 1 and 4.
* Around 23 Kms of work, few Kms short of the first town - Koratagere is being taken up now.
-
This RUB I guess will be common to both the new lines. The other being Tumakuru - Davanagere. After this RUB, bifurcation will happen, I guess, so that one RUB is enough for both the lines to cross this NH.
Well that is still far off .... No funds yet, no foundation stone laid yet ........
-
Then I got back to the city by another auto. Standing at the bus stand I enquired how to reach Oorukere. I was directed to an auto stand, from where share-auto plied. I went there but was told that no work can be seen while going, I had to walk another 1-2 Kms from the place to where the railway work was going on. I was tired and decided against going and thought - let some work finish, then I will go and see. For now, I was a happy man and returned :)
-
-
In the past few months whenever I travelled to Kalyanadurga or Ballari, I always tried to click pics of the line's work. After KRYP till Kambadur some 10 Kms of work is being done till KA border. The work is mainly ROBs, RUBs and land levelling. No track laying yet, as no rails, I guess.
Pic 9 is KRYP station. Pic 19 is the exact border, as the corresponding point on the highway has a board welcoming you to Karnataka. Pics are blurred as they were taken from the moving bus.
-
-
The work is finally over - smaller joy :)
---------------------------
While coming back when I was buying the ticket, I heard that the Pass will come to PF 2. I thought that's odd. Always it comes to 1. Maybe work at PF 1 was still going on. Then I walked to the FOB and started to climb and go to PF 2, when I noticed the board which said I was in PF 1-2. I still didn't get it. Then after I saw all the boards on the FOB and looked below at the PFs, I realised that the small PF adjacent to PF 1 was completed and that was now PF 1. Erstwhile PF 1 was now PF 2. So other numberings too have changed. That small PF looks long enough to hold a DEMU. And all around I saw that the renovation of TK was completed.
Pics 20-32.
-

Translate to English
Translate to Hindi

7 Posts

12120 views
1

Dec 22 2017 (13:41)
SteelCityRF^~
SteelCityRF^~   27542 blog posts
Re# 2906873-8              
Great work regarding Rayadurgam - Tumkur line. Thanks.
Translate to English
Translate to Hindi

10553 views
1

Feb 23 2018 (08:58)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10624 blog posts
Re# 2906873-9              
Maga, physical works have started for Tumakuru-Sira-Davangere line from Urukere: click here
Translate to English
Translate to Hindi

12014 views
0

Nov 30 2018 (09:32)
Reva18~
Reva18~   56837 blog posts
Re# 2906873-10              
TK-URUK will be single line or double?
Translate to English
Translate to Hindi

9871 views
0

Nov 30 2018 (13:04)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 2906873-11              
Same doubt I have. But unfortunately looks like single.
See /blog/post/3801450
Pic 3 and 11 are parallel to existing TK - ASK line and it looks like single line.
Pic 1 of the minor bridge, from a distance, looks broad, so hope that it will be double.
-
...
more...

Finally, railways is all about short-sightedness. That TK - DVG new line will eventually become the mainline between SBC and UBL and further North, but they are making it single. With some more funds they could have gone in and made it double in the beginning construction stage itself, but they aren't.
-

Translate to English
Translate to Hindi

9922 views
1

Nov 30 2018 (14:30)
LimaAlpha13~
LimaAlpha13~   366 blog posts
Re# 2906873-12               Past Edits
Actually TK-DVG has also started, has progressed till Vasantanarsapura (See the image, progress as of 28/11/2018):
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy