KJM can get WAG7/WAP4 on a pilot basis. Just like Gonda. But considering the amount of electrification, SWR may not get eloco shed right away. MYS-SBC,SBC-JTJ,SBC-BNC/YPR-DMM are SWR's electrified sections(480 kms approx.). Currently,SR and SCR are providing locos to SWR. It is rumoured that GTL will get an ELS to handle the load.