the train is permitted to go at a speed of 15kmph.. So it takes nearly 5 mins to cross the bridge... I guess when the wind speed increases to 60 kmph they will make the signal before the bridge to red and see if it crosses the speed level... ( Not sure) have seen signal posts on both the ends of bridge.....
One end of bridge with the signal post..