Also to add. Work was on at SSP-Byadarahalli. MYS all work seems to have been done. But still saw lot of workers busy with some final work for electrification like - the connecting vertical wires b/w the 2 cantenary wires was being tightened, with hand (!!??).
.
Also seen is Mini Vidhana Soudha from the train at RMGM. And a new member of Bleed Blue.