** Itarsi - Jabalpur Electrification Detailed Update **
1. Itarsi- Pipariya (67 KMS): Double Electric Line. Electric locos already plying.
2. Pipariya-Salichauka Road (36 KMS):- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
3. Salichauka Road - Bohani (27 KMS):- Poles erected. Clippers installed. Catenary wire along with contact wire installed, except in few patches....
more... Tightening still needs to be done. Masts at Gadarwara are erected and clippers are yet to be installed. (60 % Completed)
4. Bohani - Narsinghpur (31 KMS) :- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
5. Narsinghpur - Bheraghat (62 KMS):- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
__________________________________________________ __________________________________________________ ____________________________
In other words, just a small patch of 27 KMS bw SCKR and BHN is under construction. It's just a one month work. Apart from that everything is done. Major work left is Electrifying Jabalpur City, PFs and Yard. It'll take arounf 2 months or so, I guess. According to me, November could mark the entry of E-locos in JBP is work goes at decent pace.
#ETALDElectrification#JBPNewsP.S: Apologies for the poor quality of pics. I was not feeling like going out and taking pictures while doorplating. So I took the pictures from inside.