Instead of this, I think the time has to come to scrap non performing trains such as Shatabdi and Duronto. Also along with this, some suvidha and SFs too are needed to be scrapped. This may decrease some capacity on tracks giving other trains some much needed room. Also the old rakes of these trains can be used in giving LHB rakes to other trains.