This week the train arrived 15 mins before time at KJM and then it was kept at PF 4 for next 1 h 45 minutes before a rebuilt KJM ALCO came and hauled it to BYPL Yard. The LGD WAP-4, that had previously lead the train, was also shunted along with the rakes in dead mode.