* Too many studies to increase the speed of train on existing tracks have been conducted in past on several routes.
* 200kmph Tejas coaches already constructed and tested, 200kmph E-loco is already under construction
* Now it is time to start ground work for the strengthening/ improvement of tracks, signals etc so that the planned trains become a reality.