This board on this DEMU coaches is since 2015. I was already captured and posted. still as per this board this train is not running. the service is only as before (at the time of inauguration). approval need to be sanction as per the board you are seeing. Only extension is need from/to KURNOOL/KRNT - RAICHUR/RC. this will fulfill the long pending requirement.