not possible as of now
i actully had planned to make a detailed coverage out of that route but i was sooo tired that i coudnt even stand properly during that time.
this pic was actully taken from the inside of coach.
all i can say is that gondia bpq will see Eloco as early as 2017,bcoz all wiring has been completed except at...
more... the station patchs
also im not sure if there is any substation building up for the route.
if the line is charged,trains like krba tvc,bsp ers,bsp ten might run via this route
and wainganga and bsp mas exp will run with Eloco
also this route is profitable from feright prospective so i hope railway will charge this line soon