Demand for Dhulia-Nasik Road DEMU
From Dhulia departure time 5.30AM-6.00AM will reach Nasik Road 8.00-8.30AM
From Nasik Road departure time4.30PM-5.30PM will reach Dhulia 8.00PM
After electrification MEMU ! Any news on electrification Work started or not ?