Snapped some photographs of the doubling work on the Chengannur-Ettumanur section. These pictures are from the portion between Chengannur and Tiruvalla. I also spotted some people who I assume are inspecting the track work. Past Tiruvalla, I have noticed that electrification has not begun, and after a point the track is still to be laid. The train I am currently in(16562: Kochuveli Yesvantpur AC Express) is waiting at Changanassery, presumably for a crossing. There is some construction work going on here as well, and I will post images of that in another thread. Does anyone know when the doubling work is planned to be finished on this complete section?