The existing lands in and around Railway station premises should be effectively utilized by -3 under ground parking ,Ground Level areas and greater than 15 storied buildings have to be constructed.
Moreover the adjacent roads FLYOVER in both side of the station have to be effectively connected to the first floor level of the station so as the passengers are easily proceed to the interior platforms.