Hope the NCB-NCBD stretch is completes even before it and we get to see at least a passenger run.As the NMZ-CBD stretch is done they can start the SGUJ-CBD-SGUJ DEMU Passenger ASAP.After the whole section gets completed.NCB-SGUJ IC can again be introduced in this section with morning departures from NCB/COB and evening return.Stoppages can be Mathabhanga,NCND,Maynaguri rd,Lataguri,Neota Nadi,Malbazar,New Mal Jn,Bagrakote