Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Jun 20 23:46:26 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1569908
Posted: Aug 20 2015 (18:34)

6 Responses
Last Response: Aug 24 2015 (05:49)
3 Followers
General Travel
15993 views
13

★★
Aug 20 2015 (18:34)   CRJ/Chittaranjan (3 PFs) | RPM/WAP-4/22820
 
guest   6387 blog posts
Entry# 1569908            Tags   Past Edits
#railwayengineering
********** Detailed Explanatory Report of Some Important Events of CLW in this Year **********
...
more...
CHITTARANJAN LOCOMOTIVE WORKS
PRESS RELEASE
Electric Loco Reliability Meet in CLW
CHITTARANJAN, 28th April , 2015 : Electric Loco Reliability Meet was held at Chittaranjan Locomotive Works (CLW) on 27 & 28 April,2015 Chief Electrical Loco Engineers ( CELEs ) , Sr. Divisional Electrical Engineers ( Sr. DEEs ) of Zonal Railways , Sr. Officers from RDSO/ Lucknow and Railway Board / New Delhi participated in this meet to discuss reliability issues of the CLW built electric locomotives . Special focus was given to 3-phase locomotives provided with latest IGBT technology.
The meeting was formally chaired by Shri C.P. Tayal , General Manager, CLW and Shri Man Singh, Addl. Member ( Electrical ) Railway Board on 28th April,2015 in the Administrative office meeting room.
Shri Ved Pal , Advisor Electrical (RS) from Railway Board / New Delhi and Shri A K. Singhal, EDEM from RDSO/ Lucknow and Senior Electrical Officers from various Railways namely Eastern Railways, South East Central Railways, North Central Railways, West Central Railways, East Coast Railways, East Central Railways, Central Railways, Northern Railways, Western Railways, Southern Railways , South Eastern Railways and South Central Railways participated and actively discussed the reliability issues of 3-phase locomotives . The agenda for discussion includes emerging technology. Apart from Railway Officers, representatives from reputed manufacturers of IGBT technology attended this meet.
Shri Harindra Rao, Chief Electrical Engineer of CLW inaugurated the meet on 27th April 2015 and acknowledged the contribution of all the visiting Electrical Engineers towards improvement in the reliability of 3 phase electric locomotives manufactured by CLW . CLW also appraised Railways about the steps being taken to improve the reliability and provide latest features in CLW built locos. CLW took note of the areas of concern highlighted by all the participating Railways .
Shri C. P. Tayal, GM stressed upon to have more interaction with the Zonal Railway for better co-ordination for improving the reliability of Electric Locomotives to provide better services to Railways .
To
The News Editor
……………………………
Issued by the P R Deptt /CLW/ Chittaranjan, for further information: 09163340004
------------------------------------------------------------------------------------------------------------------------------------------------------------------------
CHITTARANJAN LOCOMOTIVE WORKS
PRESS RELEASE
CLW’S LOCO DISPATCH FOR THE YEAR 2014-15
CHITTARANJAN, 30th April, 2015: Chittaranjan Locomotive Works (CLW), the premier electric loco production unit of Indian Railways, has achieved production of 250 locomotives in the year 2014-15 and thus fulfilled the target fixed by Railway Board . During the year, CLW produced 145 three phase locos which is all time high production of 3-phase locomotives in a year . The fulfillment of Board’s target not only proves this unit’s promise of continuously improving its production tally but also proved this unit’s determination and capability to get ahead of the time as well as face challenges and overcome them . The latest technology is being utilized for manufacturing of state of the art 3-phase energy efficient electric locomotives of 6000 HP for better and safer passenger & freight services over Indian Railways.
Officers and staff of CLW are jubilant for this achievement and have vowed to improve the production figure further in the year 2015-16. Congratulating every member of CLW family, Shri C. P. Tayal, General Manager , has expressed his satisfaction for fulfillment of the production target fixed by Railway Board. He also appealed all CLW employees to keep the momentum going for enhancing production further. CLW administration is leaving no stone unturned for fulfilling its highly ambitious targets in coming years.
To
The News Editor
---------------------
Issued by the P R Deptt /CLW/ Chittaranjan, for further information: 09163340004
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
CHITTARANJAN LOCOMOTIVE WORKS
PRESS RELEASE
DISPATCH OF LAST WAG-7 SHELL OF THE YEAR 2015-16
CHITTARANJAN, 07th August, 2015 ; The Last WAG-7 Shell of Chittaranjan Locomotive Works (CLW) for the year 2015-16, was flagged off on 07.08.15 by Shri C.P.Tayal, General Manager/ CLW in a ceremony inside the shop. On the occasion, Principal HODs, Senior Officers, members of Staff Council and staff of different shops of CLW were present.
Shri Harindra Rao, Chief Electrical Engineer ; Shri A.Singh, Chief Mechanical Engineer; Shri H.Narain,FA&CAO;Shri S.Barik,Controller of Stores; Shri B.R.Kanwar, Chief Engineer; Shri G.Srinivasa Rao, Chief Personnel Officer; Dr. Alok Majumdar, Chief Medical Officer; Shri G.Swain, Chief Mechanical Engineer/Loco; Shri R.K.Tiwary, Chief Electrical Engineer / Loco; Shri M.K.Gupta, Chief Electrical Engineer / L&S and Shri R.P.Mishra, Chief Electrical Engineer / TM,Shri P.N.Pandey,CMM were all present along with other officers of CLW.
Speaking on the occasion, Shri Tayal, GM/CLW, appreciated the efforts for such successful endeavor and hoped that with this CLW will be able to change completely to three phase production very soon.He announced a group cash award of Rs.30,000/- to the ELF group of shops.
To
The News Editor
---------------------
Issued by the P R Deptt /CLW/ Chittaranjan, for further information: 09163340004
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
These three News Reports are taken from Three Word Documents which are attached with this Blog.
Also the Screenshot of the Download Link of these Three Word Documents are attached with this Blog for "Proof of Originality"

Translate to English
Translate to Hindi

1 Posts

5752 views
5

Aug 21 2015 (15:50)
guest   6387 blog posts
Re# 1569908-2              
The WAP-4 production will be stopped by CLW soon.
Attached Image:
RPM WAP-4 22820
Image Link: click here
Translate to English
Translate to Hindi

5207 views
1

Aug 21 2015 (16:25)
BengalNagpurRailway~
BengalNagpurRailway~   3092 blog posts
Re# 1569908-3              
What will happen of SER?
SER is totally dependent over these locos & their crews too are hesitant of accepting WAP-7.
Complete overhaul of running staffs is required as soon as possible...
Translate to English
Translate to Hindi

5336 views
2

Aug 21 2015 (16:28)
guest   6387 blog posts
Re# 1569908-4               Past Edits
Another is ECOR same condition.
/blog/post/1565519
Translate to English
Translate to Hindi

6187 views
2

Aug 21 2015 (22:03)
guest   6387 blog posts
Re# 1569908-5              
The Focus is NOW mainly ON 3 Phase High Speed Loco which is clearly seen from this Blog. NO Doubt in it.
Translate to English
Translate to Hindi

5856 views
1

Aug 24 2015 (05:49)
~   3007 blog posts
Re# 1569908-6              
Same condition is with ECR.Only MGS held Wap series loco that too Wap-4 so now ECR staff also needs training for WAP-7 or WAP-7 should be given to GMO as it has 125+ WAG-9.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6099034 ★★ 21jishnuthakur12301^...
4121632 ★★★ 165jishnuthakur12301^...
4307803 ★★★ 172AvishekRay~
2318079 ★★★ 78May_I_have_your_at...
5248097 ★★★ 88Jordan~
2094741 ★★★ 141~
5383447 ★★★ 135jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy