Is train ka jaipur me extension tabhi possible h jab ye conditions fulfill ho
1. Availability of proper maintenance and washing of lhb coaches at jaipur junction.
2. Platform availability at jaipur junction it seen to be very difficult for this train.
3.proper changes in timetable with suitable maintenance time provided at jaipur junction and railway ensure about punctuality of this train...
more... and running this train on time otherwise extra lhb rake is required for this train if train does not running on time with present availability of rake alternate is rake sharing with other lhb coaches train.