thanks a lot :P
yeah many WDM2 are now getting them rebuilt from patiala and are now as 3A
the condition of tracks between LKO-MB is very poor they r double electrified but are capable for just 100 kmph only
I have a doubt in future will can this track places itself as an alternate of ALD-CNB-NDLS tracks :D