Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Jul 8 03:48:03 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 1403331
Posted: Mar 21 2015 (17:51)

5 Responses
Last Response: Mar 27 2015 (21:49)
2 Followers
Info Update
4442 views
21

★★★
Mar 21 2015 (17:51)   TKD/WAP-7/30347
 
guest   6387 blog posts
Entry# 1403331            Tags   Past Edits
--------------------------- REGENERATIVE BRAKING SYSTEM OF ALL 3 PHASE AC ELECTRIC LOCOMOTIVES WHICH SAVE POWER AND ENERGY OF IR ------------------
This blog is dedicated for the "Detailed Discussion" of the Term "REGENERATIVE BRAKING" which is a "Main Feature" of all 3 Phase AC Electric Locomotives(i.e WAP-5,WAP-7 and WAG-9) and which helps railways to save both energy and money. This blog will help this Forum immensely I think.
What is Regenerative Braking?
When
...
more...
the driver of a train hauled by 3 phase Locomotive wants to stop or slow down a train, he applies regenerative braking. The motors of the locomotives which are normally pulling the train, change their mode of operation from motor to a generator. The mechanical energy of the train is converted to electrical energy by the generator, which then goes to the power supply grid.(Power Supply grid here means the Overhead Wire). This feature is called regenerative braking. Thus, even braking losses are gainfully utilised in three phase locomotives.
In other words, This is an electrical braking system in which brakes are applied on loco without physical application or brake block failure.
Advantages of Regenerative Braking:
1. Brake block does not apply on wheel so wheel and brake block wear is
eliminated.
2. Reliable braking.
3. Smooth controlling.
4. Energy generated during braking is fed back to OHE i.e. it works just
like a small power station and helps in energy conservation.
5. Braking is available up to 0 KMPH.
Effort of NCR to save energy through Regenerative Braking:
Application of brakes in trains invariably results in loss of energy. However, conservation of energy by utilising the technology of regenerative braking in electric locomotives has helped the North Central Railway to save about 15 million units of electricity costing about Rs six crore in the current financial year.When trains are required to be stopped or slowed down near railway stations or signals, the driver applies brakes. For this purpose, there are mechanical brakes, which work on compressed air, by converting the energy of the motion of a running train to frictional losses.
Pointedly, over the years, the technology upgradation has taken place in electric locomotives, which has contributed in overall objective of Railways to conserve precious electric energy. With this objective in mind, 3 phase locomotives(WAP 5,WAP 7 & WAG 9) were inducted into Railways almost 15 years ago. Initially, these locomotives were imported from Switzerland on ToT basis (Transfer of Technology). As per this agreement, when complete equipment is imported, the foreign company also undertakes to transfer the entire knowhow to the indigenous company for enabling the latter to manufacture the imported equipment in the country. After 5 years, CLW (Chitranjan Locomotives Works) started the production of three phase locomotive indigenously gradually reducing the import content to 5% only.
North Central Railway runs around 250 passenger trains and 150 trains every day by electric locomotives. Out of these, about 25% of trains are run by about three phase locomotives. Since drivers running such locomotives were required to be given special training to utilise this feature, NCR has trained all its drivers to utilise regenerative braking. Due to intelligent application of this feature, NCR has saved about 15 million units of electricity costing Rs 6 crores.
Source of this info: click here
Courtesy: Ashraf Jamal
Source of the "Advantages of Regenerative Braking: Point 6.9.8 in page 36 of the 103 page PDF Document which is already attached with Re# 1400167-40 in /blog/post/1400167 by me.
Inference drawn from above discussion:
3 Phase Locomotive does not need any power from Overhead wire at the time of applying brake to stop or slow down the Locomotive.
So from the above discussion it is also found that "3 Phase Locomotives" also saves Energy and Money of Indian Railways to a great extent through this technology of "Regenerative Braking" which is not present neither in any other Locomotive nor in any EMU DEMU or MEMU trains of Indian Railways.
So, in future in the World of Electric Locomotive Railway should rely on 3 names WAP-5 WAP-7 and WAG -9 for this very important advantage of these 3 Locomotive classes.
Attached Image:
Goods train being helped by a WAP7 from the rear
Pic Courtesy: prdp
Image Link: click here
This Pic is taken from a Video of by prdp the link of which is:
click here
Video Courtesy: prdp
TKD WAP-7 30347
Image Link:click here
All are requested to share views.

Translate to English
Translate to Hindi

4 Public Posts - Fri Mar 27, 2015

1788 views
0

Mar 27 2015 (21:49)
guest   6387 blog posts
Re# 1403331-24              
There is nothing to mind. It's true. Actually CLW also has a planning to develop HOG systems in WAP-4 Locos but as per the Last Annual Report of RDSO(Year 2011-2012) RDSO gave much preference in 3 Phasers than the Conventional Ones as because if cost constraint is taken into factor to install HOG, and other 3 Phase Features in existing WAP-4 fleet is much more complicated and costly too than retain this WAP-4 class with it's originality. You also well aware of the fact that maintenance cost of WAP-4 is much more than the 3 Phase Locomotives also the present fleet of WAP-4 of IR are not all originally WAP-4 many locos of the WAP-4 fleet was WAP-1 initially then converted to WAP-4. So now these locos are getting old so applying 3 Phase Features on these Locos won't be prudent either technically or physically.
Lastly
...
more...
the material used for WAP-4 Shell and WAG-7 Shell is becoming Limited. So this year may be the last year of production of both of these Locos(WAP-4 and WAG-7) on the part of CLW subject to the availability of Tender for these two Locos. If tender is available then production of these two Locos may continue but in less number than it's 3 Phase Competitors.
The demand for 3 Phasers is now gaining as a result of Which Royapuram gets maximum number of WAP-7 in last Couple of months and many important trains of SR now hauled by RPM WAP-7 in place of WAP-4. In the Coming days WAP-7 will take the place of WAP-4 may be it will take some time but it will definitely happen in future as the present trend is Showing.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy