I propose the train route should be as follows. Depoarture from Panvel>Madgaon>Hubli>Bellary>Guntakal>Cuddapah>Renigunta>Tirupati. The journey period will not be more than 20 hours considering that the train will be pulled by High Powered Diesel Engine on both sides. Railways consider this suggestion in right direction.