Status of Tamluk - Haldia (Durgachak) doubling work at SSPH. The new line has been laid from Keshabpur (KSBP) to the bridge over Hijli canal at SSPH, but it is discontinuous for a very small stretch (~ 1 km) after that (before MSDL station). This discontinuity just after the bridge is because of a landslide which happened few months back.
28th Dec, 2014