Your are partially correct sir, MS-ED was extended to CBE, MAQ-PGT IC was extended to TPJ. By cancelling MAQ-TPJ the CBE train was extended to MAQ, the schedule departure of both the trains at CBE were in the difference of 10 minutes, when both were running