once the ET-ALD route via jbp will be electrified halt timing of many trains going towards ET-JBP-KTE-ALD will be reduced because no engine change is needed and trains coming from mumbai can go further to jbp-kte-ald with a single electric loco and electrification will save much time so hope to c the work will complete asap