Looks like there is a 3rd line proposal from Khurda to VZM via Sompeta;
Tenders are from EcoR called for the folowing two proposals;
1.Carrying out Preliminary Engineering cum Traffic Survey for the proposed 3rd line from Khurda Road to Sompeta
2.Carrying out Preliminary Engineering cum Traffic Survey for the proposed 3rd line from Sompeta to Vizianagaram.