GM's Annual Inspection in ER takes place generally during December-March period.
тАвGM inspects a section of every division (HWH, SDAH, ASN & MLDT). He may also inspect any Carshed, Loco Shed, Workshop, Hospital, Museum, Coaching yard, etc.
тАвSenior divisional officers propose to GM for visiting any section of their division / Hospital / working place.
тАвA tentative schedule is chalked out. Atleast 8-10 months ahead, it is decided which section/ place GM shall visit. Developments are made in that way.
тАвGM usually inspects according to a pre-planned schedule of things (like TRD depot, station building, railway colony, RRI, running room, food plaza, bridge, curve, etc.)
.
ЁЯТаNow,I am only aware & interested about GM Inspection in HWH & SDAH divisions. Taking live experience of Inspection at SDAH div is Not possible by me, as every year, GM's Inspection occur at MID-NIGHT at SDAH division (This happens to get a free path for the train, which may stop anywhere, take speed trials & there is no EMU blocking the path/path of EMU being blocked)
.
тАвGM is supposed to be the most important person of a Railway zone & GM's Inspection is a very very serious event
тАвIt is not that only GM inspects everything, lots of higher officers also inspect along with him.
тАвEvery department should make everything proper. Everything means everything. GM can stop anywhere, inspect anything on his path. He may not always follow the pre-determined "stoppages of visit" , but will definitely follow the "scheduled route". So upgradation of "everything" occurs only the stations/buildings,etc lying in his path where he is supposed to inspect, NOT the whole division.
тАвThe station building, platforms, tracks are cleaned & painted from top to bottom. No dirt should be there. Water taps should be running. Enough lights should be provided. Seating arrangement & sheds should be appropriate.
тАвNo plastic & waste should be along the tracks. Railways burn them down. All unwanted plants & bushes are cleared out.
тАвTracks, switches, points, joints, guard rails should be painted, in different colors. Each color has a meaning ( which we Railfans can't identify without manual)
тАвTracks should be smooth. Engineering department needs to ensure GM's train should not get any bumpy ride.
тАвEvery sign board, indicator should be in proper order.
тАвGM's train should be provided the highest priority. A relief engine should run after GM's train or run attached to GM's train for emergency in case the leading loco fails.
тАвGM's train may have any instrument or track recording equipment in it. Every officer should prepare a project report related to his department/team & show it to GM on demand, any time
тАвGM generally takes Speed trial in a stretch of his alloted section.
тАвGM generally inaugurates atleast 1 project during his Inspection (it may be children's park, seating area, water cooler, waiting hall, running room, any technological equipment, etc)
тАвGM also interacts with field staffs & other staffs. They should be ready for any question.
тАвNow u will compare, what of the above "expected items of Inspection" actually happened.
.
.
ЁЯТаNow lets come to the topic, "GM's Annual Inspection over KAN (incl.) - BWN - HWH via-HBC (120 Kms.)
тАвU can get from the heading, the Inspection is to start from Khana & come to Howrah (not the opposite)
тАвShri Suneet Sharma, GM/ER's train left Howrah at 07:45 powered by 30494 WAP7 (at DLI end) & idle 30557 WAP7 (at HWH end ) [Picture provided]. It is a long train with many coaches with atleast 100 officers,staffs,security travelling along. Shri Ishaq Khan,DRM/HWH was along.
тАвThe train reached Khana PF1A at 09:30. GM inspected Khana station, Point No.60A,Curve No.11 & LC-60/T/Spl. His train went to the next station, Jhapater Dhal for train reversal after dropping him at Khana. 30494 detached there. 30557 was now leading loco. 30494 was the reliever loco, and followed the GM's train till Howrah. The train came back to Khana & started at 09:55 to Barddhaman with GM & others.
.
тАвThe train arrived Barddhaman PF5 at 10:08 (2 mins ahead of TT). GM got down & was greeted by officers. A lot of officers & security staff got down. GM went to the FOB to PF1, inspected the Crew lobby. BA test was shown & other items was displayed to him. He then inspected the waiting hall, food stalls, running room,health unit,RRI.
тАвMeanwhile, his team of senior officers started inspecting themselves, water taps, FOB, cleanliness of parked trains, functioning of display boards, escalators, water coolers, toilets, etc.
The team was just like surveying,with pen & papers, noting everything in an autonomous manner.
тАвOn the other hand, GM visited the renovated station building, a part of which colasped in First week of January. He had a press conference & went straight to the Diesel Shed.
тАвHe inspected the diesel shed & its sections. DLS/BWN was celebrating its Golden Jubilee (1970-2020). The DLS was officially converted to DLS cum ELS by GM, by flagging off First Electric Locomotive of DLS/BWN named "KAVIGURU". It is a WAG9 & is also the First Comissioned 3ph Goods Loco of ER.
тАвGM then inspected the RPF barrack, Loco Colony & inaugurated a Children Park
тАвAfter all these, his train left Barddhaman at 13:00.
.
тАвHis train stopped at LC-47/E for Inspection at 13:08. He also interacted with Gang No.4. The train left at 13:25.
.
тАвHe conducted a speed trial on 33Km. stretch between Palla Road & Belmuri.
.
тАвHe arrived at Belmuri at 13:40. After lunch break, he again started his Inspection. He & other officers visited the Railway colony, interacted with the dewllers, inaugurated a Reading room & Yoga room. He inspected Belmuri station & TRD depot.
His train left Belmuri at 15:25
.
тАвHis train arrived Chandanpur at 15:35. He inspected the Julka river bridge and also inspected the under construction brigde for 4th line. He left at 15:55
.
GM's train arrived Dankuni at 16:10. He inspected the station & RRI. His train left for Howrah at 16:50
.
GM arrived Howrah at 17:10. He inaugurated a Stimulator Room at Howrah.
.
This is how, GM Inspection is carried out.
.
.
ЁЯТаNow, one may think, what is the purpose of such Inspection?
тАвGM ensures every division is working properly and providing amenities to passengers through this Inspection.
тАвThe section which GM inspects gets hugely developed for his Inspection.From tracks to stations everything is renovated! As u know, he may stop wherever he wishes.
тАвI remember HBC had TSRs imposed over various places,rails & sleepers being changed, etc. from 7-8 months ago. These were indications that the section shall have GM Inspection.
ЁЯТаThe most important drawback of this Inspection is -- GM does not inspect PUNCTUALITY of running trains during this Inspection.
тАвThe Inspection is like an eye wash to the GM, but his team of officers independently check the passenger amenities in more detailed way.
тАвGM rarely interacts with Passengers during his Inspection as he has very tight schedule
тАвU will find station staffs extremely helpful & well dressed this day, this is no lesser than an Annual Function being held. Even I was surprised by the extremely helpful behaviour of the RPF... as if the tea had excessive sweetness that day.
.