during oscillation trials train is tested at 10% excess speed than the permitted/sanctioned MPS of line. WR, for instance, after AC-fication in mumbai division had trials at 145 Kmph before 130 clearance was given in VR-BRC-GDA/ADI sections. +5 Kmph isn't much actually, but safety reasons force them to restrict it within sanctioned speed.