Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Fri Apr 26 08:21:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Medium; Side View; Small TB; Sleeper; Outside of Train; Standing at Station;
Entry# 4823456-0

S1 coach with English TB, captured on 20th June
Entry# 5757463-4


17643/Circar Express (PT)
सरकार एक्सप्रेस

CGL/Chengalpattu Junction --> COA/Kakinada Port

Latest News
(You need to double-check/verify this info yourself)
Train No. 17643 Puducherry - Kakinada Port Circar Express scheduled to leave Puducherry at 13.30 hrs on 05.04.2024 is rescheduled to leave Puducherry at 14.15 hrs due to late running of pairing train.
Fri Apr 05, 2024 (01:07PM)
News History
🔹JCO 23.06.2024 to 10.08.2024 is Fully Cancelled due to Traffic Block in Nidadavolu - Kadiyam Section.
Wed Feb 21, 2024 (09:04PM)
W.E.F Run with B5 Coach from Chengalpattu Junction 24 - March 2023 Revised CC :- 2 SLR Coaches + 2 GENERAL Coaches + 12 SLEEPER Class Coaches + 5 - 3rd AC Coaches and 1 - 2 nd AC Coach Total = 22 Coaches
Tue Mar 21, 2023 (12:41PM)
W.E.F Run with Electric Loco from Chengalpattu Junction To Kakidada Port 15-oct 2022
Fri Oct 14, 2022 (09:59PM)
📢This Train Diverted Via EE , TDD on 01-03-2022 and 02-03-2022 From Chengalpattu Because NI Works On BhimavaramTown To Aravalli Route DL1 and DL2 D3 and In D2 seat no 51 to 90 are Unreserved
Wed Feb 23, 2022 (10:13AM)
DL1 and DL2 D3 and In D2 seat no 51 to 90 are Unreserved
Thu Feb 10, 2022 (12:11PM)
DL1 and DL2 D1 and In D2 seat no 51 to 90 are Unreserved
Thu Feb 10, 2022 (08:10AM)
.
Fri Nov 19, 2021 (10:21AM)
3 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Oct 01, 1965
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is Only Available at Tambaram, Chennai Egmore, Gudur & Nellore
Updated: Mar 22 (10:24) by TAGEERUANUBHARADWAJ^
Dep:
Arr:
Rating: 3.5/5 (71 votes)
cleanliness - good (12)
punctuality - average (12)
food - good (12)
ticket avbl - good (12)
u/r coach - good (6)
railfanning - good (11)
safety - good (12)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
S12
  4
S11
  5
S10
  6
 S9
  7
 S8
  8
 S7
  9
 S6
 10
 S5
 11
 S4
 12
 S3
 13
 S2
 14
 S1
 15
 B5
 16
 B4
 17
 B3
 18
 B2
 19
 B1
 20
 A1
 21
 GS
 22
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Picture & Video Gallery

Page#    177 Pic/Video Blogs  <<prev  next>>

17643/Crcr Exprss BZA/Vjywd
Please Like Share Comment and Subscribe ...
×

17209/Sshdr Exprss COA/Kknd Prt
Latest Pics Of COA 3rd Pitline Works ...
×

17643/Crcr Exprss BZA/Vjywd
Agree and adding more information to your post.For A period of...
×

17643/Crcr Exprss RJY/Rjhmndry
As per my openion if railway construct a line between...
×

@KVZ   34m late@KVZ: Kavali &16 km/h Departed Kavali n overtook #17643:...
×

17643/Crcr Exprss RJY/Rjhmndry
Circar & seshadri express boarding in 2021 &2022
×

17643/Crcr Exprss NLR/Nllr
Third Line between Kavali and SriVenkateswarapalem Commissioned along with electrification as...
×

17643/Crcr Exprss NDD/Nddvl
Train which started 3hrs after this train from BZA overtaken this...
×

17643/Crcr Exprss NDD/Nddvl
Latest Video of Nidadavolu Tanuku ElectrificationCredit: Madhurailworld ...
×

17643/Crcr Exprss BZA/Vjywd
Already Kakinada port started Container Traffic from 2015 Onwards BVRM...
×

17643/Crcr Exprss BVRT/Bhmvrm Twn
ATTENTION PASSENGERSThe following Trains are Cancellated due to NI Works between...
×

17643/Crcr Exprss BZA/Vjywd
Please Watch My VideoBhimavaram Nidadavolu Doubling and Electrification Part 1 ...
×

17643/Crcr Exprss RJY/Rjhmndry
Circar & seshadri express boarding in 2021 &2022
×

17643/Crcr Exprss NLR/Nllr
Third Line between Kavali and SriVenkateswarapalem Commissioned along with electrification as...
×

17643/Crcr Exprss NDD/Nddvl
Train which started 3hrs after this train from BZA overtaken this...
×

17643/Crcr Exprss BZA/Vjywd
see sr gave path constrain for vskp-ynk
×

17643/Crcr Exprss BZA/Vjywd
Circar Took 2h 52 min from BZA To NDD with 10...
×

17643/Crcr Exprss BZA/Vjywd
Check it
×

17643/Crcr Exprss NDLS/Nw Dlh
Interesting Facts ...
×

17643/Crcr Exprss SC/Scndrbd
The FY 2021-22 records a momentous milestone with Electrification of 80%...
×

17643/Crcr Exprss NLR/Nllr
Third Line between Kavali and SriVenkateswarapalem Commissioned along with electrification as...
×

17643/Crcr Exprss NDD/Nddvl
Half dozen trains overtaken this train today at Ndd 12846 20810...
×

17643/Crcr Exprss BZA/Vjywd
Meru cheppandi deni guranchi ??
×

17643/Crcr Exprss VSKP/Vskhptnm
I could find attachment in the same website. May be useful...
×

17643/Crcr Exprss BZA/Vjywd
Please Watch My Video Bhimavaram Nidadavolu Doubling and Electrification Part 3Please...
×

17643/Crcr Exprss RJY/Rjhmndry
Right now CC is S7 B2 A1.. and running with 100%...
×

17643/Crcr Exprss NLR/Nllr
Third Line between Kavali and SriVenkateswarapalem Commissioned along with electrification as...
×

17209/Sshdr Exprss COA/Kknd Prt
Latest Pics Of COA 3rd Pitline Works ...
×

17643/Crcr Exprss BZA/Vjywd
Agree and adding more information to your post.For A period of...
×

17643/Crcr Exprss VSKP/Vskhptnm
An update of Aravalli to Nidadavolu doubling CRS Finally time has...
×

17643/Crcr Exprss BZA/Vjywd
Please Watch My Video Bhimavaram Nidadavolu Doubling and Electrification Part 2...
×

17643/Crcr Exprss RJY/Rjhmndry
Daily ide paristiti... Dobbi dobbi teeskochina sare Gnt ki 3:15 kalla...
×

17643/Crcr Exprss NLR/Nllr
Third Line between Kavali and SriVenkateswarapalem Commissioned along with electrification as...
×
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy