Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

Gaya's Mahabodhi: Tumse Milne Ko Dil Karta hai, Tumhi Ho Jispe Dil Marta hai - Ashwani Kumar

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Mon Aug 8 04:13:41 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 646392-0

GTR/Grant Road (4 PFs)
ग्रॅन्ट रोड     ग्रांट रोड

Track: Quadruple Electric-Line

Show ALL Trains
Frere Bridge, Grant Road West, Zoroastrian Colony, Grant Road, Mumbai - 400007
State: Maharashtra

Elevation: 7 m above sea level
Zone: WR/Western   Division: Mumbai

No Recent News for GTR/Grant Road
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 4
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 3.1/5 (8 votes)
cleanliness - good (1)
porters/escalators - poor (1)
food - average (1)
transportation - good (1)
lodging - poor (1)
railfanning - excellent (1)
sightseeing - excellent (1)
safety - average (1)
Show ALL Trains

Station News

Page#    Showing 1 to 20 of 23 News Items  next>>
In a major announcement, Minister of State for Railways Raosaheb Patil Danve announced a 50 per cent reduction in the ticket prices of local AC trains in Mumbai.

This comes as Mumbai and several parts of the country are experiencing high temperatures. With trains being the lifeline of the maximum city, this fare reduction is set to cheer daily passengers.

According
...
more...
to the India Meteorological Department’s (IMD) monitoring station in Santacruz, Mumbai has seen above-normal temperatures since April 19, with two significant spikes on April 21 and April 24, when the temperature touched 38.9 and 38.5 degrees.
Dec 17 2021 (13:00) Mumbai: Commuters on western side of MCGM skywalk now to have access to all platforms of Grant Road station (www.freepressjournal.in)
New Facilities/Technology
WR/Western
0 Followers
7837 views

News Entry# 472529  Blog Entry# 5164942   
  Past Edits
Dec 17 2021 (13:00)
Station Tag: Grant Road/GTR added by न्यूज अच्छी है चलो इसपर वीडियो बना देता हु/1084688
Stations:  Grant Road/GTR  
Mumbai: Commuters on western side of MCGM skywalk now to have access to all platforms of Grant Road station
Commuters on the western side of MCGM skywalk will now have access to all platforms of Grant Road station and also connectivity to the east side skywalk to Frere Road Over Bridge. It will facilitate passengers to enter Platform 1 of Grant from skywalk and vice versa and reduce passenger traffic load at west side of Grant Road station .
MRVC has just completed the construction of a 23 metre-long skywalk on Platform
...
more...
no 1 of Grant Road station, connecting South end Foot Over Bridge and MCGM's Skywalk on West side. This skywalk is thrown open for public on December 15th. Apart from that Western Railway has commissioned two new lifts at Dadar station and has been put into public service also from 15th December, 2021.
"The newly commissioned skywalk at Grant Road station has been constructed by Mumbai Rail Vikas Corporation (MRVC). This skywalk on PF No.1 of Grant Road station has been constructed at a cost of Rs. 23 lakh and is 23 metres long and 5 metres wide" said an officer of wr adding that, It connects the South end FOB as well as MCGM's Skywalk on West side. With this, now the commuters coming from west side MCGM skywalk will have access to all platforms and will also provide connectivity to east site skywalk to Frere ROB.
Apart from skywalk of Grant Road station, two new elevators have been provided on the Foot over Bridge at Platform No. 1 and 5 at Dadar station and have been constructed at an approx. cost of Rs. 39 lakh each. These elevators have a capacity of 20 passengers.
"In addition to curb the menace of trespassing, this will also prove beneficial for the comfort and convenience of elderly persons, Divyangjan, pregnant women and children. It will provide the passengers a safer and more convenient way to travel" said an officer of WR.
"Currently 37 Lifts have been commissioned over Mumbai Division including 27 in Mumbai suburban section and additional 12 more Lifts are planned to be installed in this financial year" further added officials.
Conferming the development, spokesperson of WR said , "Railway urges its valued passengers to care for their precious life and not to trespass railway tracks. Always use FOB, Subway, Escalators and Lifts to crossover and change platforms".
Nov 15 2021 (18:11) Dadar and 3 other railway stations in Mumbai to be rebuilt (www.mumbailive.com)
Other News
WR/Western
0 Followers
29928 views

News Entry# 470092  Blog Entry# 5124194   
  Past Edits
Nov 15 2021 (18:11)
Station Tag: Mahalakshmi/MX added by ForeverRailfan/248735

Nov 15 2021 (18:11)
Station Tag: Charni Road/CYR added by ForeverRailfan/248735

Nov 15 2021 (18:11)
Station Tag: Grant Road/GTR added by ForeverRailfan/248735

Nov 15 2021 (18:11)
Station Tag: Dadar Western/DDR added by ForeverRailfan/248735
The Western Railways (WR) is set to rebuild Grant Road, Charni Road, Mahalaxmi and Dadar stations that see significant footfalls to enhance passenger amenities, states reports. The officials have said that the work for the same is likely to begin before March 2022. 
A number of new inter-linked Foot Overbridges (FoB), several of them which are inter-connected, have come up at Dadar station, has upgraded the station's connectivity. At the Churchgate-end, an old Brihanmumbai Municipal Corporation (BMC) FoB is also being rebuilt, and the old elevated ticket booking offices at the southern end has already been demolished. 
Also
...
more...
read: Mumbai Local News: WR To Soon Introduce 20 AC Trains Services In A Day
A WR official has stated that they are preparing General Arrangement Drawings for incorporating offices and other amenities at the new station buildings at Dadar.
The elevated booking office at Mahalaxmi, which is not in good condition, is also revamped. Maharashtra Rail Infrastructure Development Corporation and the civic body will be rebuilding the old Mahalaxmi Road bridge with a cable-stayed bridge. They are waiting for approval of the General Arrangement Drawings for this station from the head office.
At Charni Road and Grant Road, the new station buildings with the ticket booking offices will be coming up soon. The General Arrangement Drawings for Charni Road is already finalised, and they are preparing the structural design. 
Meanwhile, the Central Railway (CR) has decided to remove all British-era Overhead Equipment (OHE) masts by June 2022.
Aug 27 2020 (18:48) WESTERN RAILWAY SUCCESSFULLY LAUNCHED 8 GIRDERS ACROSS TRACKS AT FRERE ROB BETWEEN CHARNI ROAD AND GRANT ROAD (wr.indianrailways.gov.in)
Other News
WR/Western
IR Press Release
0 Followers
36239 views

News Entry# 417069  Blog Entry# 4697114   
  Past Edits
Aug 27 2020 (18:48)
Station Tag: Charni Road/CYR added by Forever Railfan/248735

Aug 27 2020 (18:48)
Station Tag: Grant Road/GTR added by Forever Railfan/248735
Stations:  Charni Road/CYR   Grant Road/GTR  
n a six hours block Western Railway launched 8 Nos of 25 m long steel girders across tracks at Frere ROB located between Charni Road and Grant Road stations of Western suburban section. The audit conducted by IITB had earlier suggested major repairs, however, subsequently condition of girders became precarious when the inspections revealed severe corrosion connections between longitudinal and cross girders supporting the road. IITB had therefore suggested immediate re-girdering. The ROB was closed for traffic since the midnight of 16th /17th January, 2020. The dismantling of old girders was done o­n 8th February, 2020. The jacketing of existing abutment was taken up first o­n west side & then east side including casting of new pedestals. A Traffic & Power block was taken between Charni Road & Grant Road station o­n the intermittent night of 24th & 25th August, 2020 o­n all the lines.
According
...
more...
to a press release issued by Shri Sumit Thakur- Chief Public Relations Officer of Western Rly, the British era ROB was constructed in the year 1921. The ROB had a complex structure with 350 sqm of concrete slab supported o­n 10 Nos of 16m long tertiary girders, 14 Nos of 25m long secondary girders, 10 Cross girders of 16m length finally supported o­n two main girders of 25m length. Total weight of existing girders of this ROB is approx. 220 MT and it was dismantled earlier in a major block of 8 hours o­n8th / 9th February, 2020. Amidst the restrictions of COVID pandemic and lock down since March 23, 2020, Western Railway has completed the fabrication of girders and strengthening of substructure of ROB and finally launched the girders across the tracks. The suburban section between Churchgate and Mumbai Central was closed during this period and all UP local trains were short terminated at Mumbai Central and down local trains were started from Mumbai Central during this period. 9 suburban trains were affected due to this major block.
Shri Thakur further added that re-girdering posed twin challenge of maintaining the level of approach road without appreciable raising and providing increased clearance under the bottom of girder to satisfy the requirement of Railway. Western Railway took up the design themselves and these challenges were met with by a design with tapered girders that needed minimal raising road level of about 80 cm. This will pave way for early restoration of road by MCGM. Special grade steel (E 450) has been used for girder fabrication to provide increased strength and service life. The girders were metalized and stainless steel reinforcement has been used in concrete to provide enhanced durability looking at the corrosive environment of Mumbai. The girders were fabricated in RDSO approved Workshop at Palghar.
Looking at the future increase in traffic the ROB will have two separate carriage ways with a divider in between and two pedestrian walkways o­ne o­n each sides. The road width has also been increased to 17.50 m against the present width of 16.78 m. The Western Railway intends to complete its portion of work by end of September, 2020. Rebuilding of approach road at this ROB is being done by MCGM.
Aug 23 2020 (10:48) SIX HOURS GIRDER LAUNCHING BLOCK BETWEEN CHARNI RD AND GRANT ROAD (wr.indianrailways.gov.in)
IR Press Release
0 Followers
44016 views

News Entry# 416874  Blog Entry# 4693807   
  Past Edits
Aug 23 2020 (10:48)
Station Tag: Grant Road/GTR added by Forever Railfan/248735

Aug 23 2020 (10:48)
Station Tag: Charni Road/CYR added by Forever Railfan/248735
Stations:  Charni Road/CYR   Grant Road/GTR  
Western Railway has planned aTraffic & Power block between Charni Road and Grant Road station o­n 24th/ 25thAugust, 2020.
According to a press release issued by Shri Sumit Thakur- Chief Public Relations Officer of Western Rly, girder launching of 8 girders for Ferrere Road Over Bridge between Charni Road and Grant Road is to be carried out. A six hours block from 23.40 hrs of 24thAugust to 05.40 hrs of 25th August, 2020 is being carried out o­n all lines. During the block, there will be repercussions o­n some of the suburban services. o­n Down slow line, the last local will be VR 289 ex Churchgate at 23.30 hrs. o­n Up slow line, the last local will be for Churchgate BO 274
...
more...
ex Borivali at 22.30 hrs. o­n Down fast line the last local will leave Churchgate at 23.15 hrs and o­n Up fast line, the last local VR 280 will leave at 22.15 hrs for Churchgate. Some trains will be partially cancelled i.e 6 Up services and 3 Down services. The following Up services will be partially cancelled between Vasai Rd and Churchgate :-BO 278, VR 282, VR 284, VR 286, VR 288 & VR 290. In the Dn direction, the trains that will be partially cancelled between Churchgate and Vasai Road are VR 1, VR 5 & VR 9. Inconvenience caused to passengers is deeply regretted by Western Rly.
Page#    Showing 1 to 20 of 23 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy