Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Gallery Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun May 26 15:10:42 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

MTM/Machilipatnam (2 PFs)
Local Name: Bandaru
मचिलीपट्णम
మచిలీపట్నం


Track: Double Electric-Line

Updated: Apr 03 2023 (00:22)
Show ALL Trains
Port Rd., Circlepet , Machilipatnam, Krishna District, Pin- 521001
State: Andhra Pradesh

Elevation: 2 m above sea level
Type: Terminus   Category: NSG-5
Zone: SCR/South Central   Division: Vijayawada


No Recent News for MTM/Machilipatnam
Nearby Stations in the News
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 14
Number of Terminating Trains: 14
1 Follows
Rating: 3.9/5 (39 votes)
cleanliness - good (5)
porters/escalators - average (4)
food - good (5)
transportation - excellent (5)
lodging - good (5)
railfanning - good (5)
sightseeing - good (5)
safety - excellent (5)
Show ALL Trains

Picture & Video Gallery

Page#    Showing 101 to 125 of 173 Pic/Video Blogs  <<prev  next>>

17211/Kndvd Exprss MTM/Mchlptnm
🥳🤩🥳First LHB Run For17211 - Kondaveedu Express 🤩Chart Prepared🤩🥳🤩
×

17211/Kndvd Exprss MTM/Mchlptnm
Pic 1 to 4:BZA WAP 4 doing shunting activities at machilipatnam...
×

07012X/Mchlptnm Hydrbd MTM/Mchlptnm
New Machilipatnam Railway Station Building And New Vijayawada WAG9HC With Lhb...
×

17211/Kndvd Exprss MTM/Mchlptnm
Kondaveedu likely to get LHB from Jan 21.A new lhb rake...
×

GNT/Gntr
3E Economy fare structure details released by Ministry of Railway
×

MTM/Mchlptnm
😊😊😊Station Boards Entrance MachilipatnamMTM 😊😊😊
×

02749/Mchlptnm Bdr MTM/Mchlptnm
🤪🤪🤪Train Boards#TBMTM BIDR MTM S F Express Special🤪🤪🤪
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Machilipatnam 1) New Station Building2) New Unloading/ LoadingPoint3) New IOH shed
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Machilipatnam 1) New Station Building2) New Unloading/ LoadingPoint3) New IOH shed
×

MTM/Mchlptnm
1. TKD WAG-9H (I) 316342. GD WAG-7 270963. LGD WAP-7 303384....
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Pics 1,2 : New train boards for kondaveedu expPic 3...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
WAP 4 on Charge for YPR bound Kondaveedu EXP,Spotted HA1 coach...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Mtm Ypr kondaveedu first end to end run on electric traction...
×

02749/Mchlptnm Bdr MTM/Mchlptnm
Mtm bidr sf exp becomes the first train to run with...
×

12749/Mchlptnm Bdr MTM/Mchlptnm
My dream has come true.SR'S ED WAP-4 22219 with MTM BIDR...
×

17211/Kndvd Exprss MTM/Mchlptnm
Kondaveedu express and MTM - Bidar express runs with Electric loco...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×

MTM/Mchlptnm
Gdv mtm electric loco trail , spotted at gdv Pic credits...
×

17211/Kndvd Exprss MTM/Mchlptnm
All set for first lhb run of 🎉 MTM-YPR KONDAVEEDU EXP.Train...
×

17211/Kndvd Exprss MTM/Mchlptnm
Pic 1 to 4:BZA WAP 4 doing shunting activities at machilipatnam...
×

07012X/Mchlptnm Hydrbd MTM/Mchlptnm
New Machilipatnam Railway Station Building And New Vijayawada WAG9HC With Lhb...
×

17211/Kndvd Exprss MTM/Mchlptnm
Kondaveedu likely to get LHB from Jan 21.A new lhb rake...
×

GNT/Gntr
3E Economy fare structure details released by Ministry of Railway
×

MTM/Mchlptnm
😊😊😊Station Boards Entrance MachilipatnamMTM 😊😊😊
×

02749/Mchlptnm Bdr MTM/Mchlptnm
🤪🤪🤪Train Boards#TBMTM BIDR MTM S F Express Special🤪🤪🤪
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Machilipatnam 1) New Station Building2) New Unloading/ LoadingPoint3) New IOH shed
×

MTM/Mchlptnm
ED/WAG-7 🐅 BHEL made..
×

MTM/Mchlptnm
1. TKD WAG-9H (I) 316342. GD WAG-7 270963. LGD WAP-7 303384....
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Pics 1,2 : New train boards for kondaveedu expPic 3...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
WAP 4 on Charge for YPR bound Kondaveedu EXP,Spotted HA1 coach...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Mtm Ypr kondaveedu first end to end run on electric traction...
×

02749/Mchlptnm Bdr MTM/Mchlptnm
Mtm bidr sf exp becomes the first train to run with...
×

12749/Mchlptnm Bdr MTM/Mchlptnm
My dream has come true.SR'S ED WAP-4 22219 with MTM BIDR...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
After 9 months of Gap Kondavvedu Express is back with New...
×

17211/Kndvd Exprss MTM/Mchlptnm
All set for first lhb run of 🎉 MTM-YPR KONDAVEEDU EXP.Train...
×

17211/Kndvd Exprss MTM/Mchlptnm
Pic 1 to 4:BZA WAP 4 doing shunting activities at machilipatnam...
×

07041/Mchlptnm Scndrbd MTM/Mchlptnm
Changing of Suvidha into Special ExpressBy IndianRailways Thank you
×

17245/Mchlptnm Dhrmvrm MTM/Mchlptnm
💠🥀💠In rememberance to this beautiful service which plied between Dharmawaram...
×

MTM/Mchlptnm
😊😊😊Station Boards Entrance MachilipatnamMTM 😊😊😊
×

MTM/Mchlptnm
😊😊😊Station Boards Entrance MachilipatnamMTM 😊😊😊
×

02749/Mchlptnm Bdr MTM/Mchlptnm
🤪🤪🤪Train Boards#TBMTM BIDR MTM S F Express Special🤪🤪🤪
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Machilipatnam 1) New Station Building2) New Unloading/ LoadingPoint3) New IOH shed
×

MTM/Mchlptnm
ED/WAG-7 🐅 BHEL made..
×

MTM/Mchlptnm
1. TKD WAG-9H (I) 316342. GD WAG-7 270963. LGD WAP-7 303384....
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Pics 1,2 : New train boards for kondaveedu expPic 3...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Mtm Ypr kondaveedu first end to end run on electric traction...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Mtm Ypr kondaveedu first end to end run on electric traction...
×

02749/Mchlptnm Bdr MTM/Mchlptnm
Mtm bidr sf exp becomes the first train to run with...
×

12749/Mchlptnm Bdr MTM/Mchlptnm
My dream has come true.SR'S ED WAP-4 22219 with MTM BIDR...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×

17211/Kndvd Exprss MTM/Mchlptnm
Pic 1 to 4:BZA WAP 4 doing shunting activities at machilipatnam...
×

07012X/Mchlptnm Hydrbd MTM/Mchlptnm
New Machilipatnam Railway Station Building And New Vijayawada WAG9HC With Lhb...
×

07041/Mchlptnm Scndrbd MTM/Mchlptnm
Changing of Suvidha into Special ExpressBy IndianRailways Thank you
×

MTM/Mchlptnm
Mtm krnt mtm triweekly special in the path of kondaveedu
×

MTM/Mchlptnm
😊😊😊Station Boards Entrance MachilipatnamMTM 😊😊😊
×

MTM/Mchlptnm
😊😊😊Station Boards Entrance MachilipatnamMTM 😊😊😊
×

07769/Vjywd Mchlptnm MTM/Mchlptnm
Running Of Special Train
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Machilipatnam 1) New Station Building2) New Unloading/ LoadingPoint3) New IOH shed
×

MTM/Mchlptnm
ED/WAG-7 🐅 BHEL made..
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Pics 1,2 : New train boards for kondaveedu expPic 3...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Mtm Ypr kondaveedu first end to end run on electric traction...
×

02749/Mchlptnm Bdr MTM/Mchlptnm
Mtm bidr sf exp becomes the first train to run with...
×

02749/Mchlptnm Bdr MTM/Mchlptnm
Mtm bidr sf exp becomes the first train to run with...
×

12749/Mchlptnm Bdr MTM/Mchlptnm
My dream has come true.SR'S ED WAP-4 22219 with MTM BIDR...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×

17211/Kndvd Exprss MTM/Mchlptnm
Pic 1 to 4:BZA WAP 4 doing shunting activities at machilipatnam...
×

07012X/Mchlptnm Hydrbd MTM/Mchlptnm
New Machilipatnam Railway Station Building And New Vijayawada WAG9HC With Lhb...
×

17211/Kndvd Exprss MTM/Mchlptnm
Kondaveedu likely to get LHB from Jan 21.A new lhb rake...
×

GNT/Gntr
3E Economy fare structure details released by Ministry of Railway
×

MTM/Mchlptnm
😊😊😊Station Boards Entrance MachilipatnamMTM 😊😊😊
×

MTM/Mchlptnm
😊😊😊Station Boards Entrance MachilipatnamMTM 😊😊😊
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Machilipatnam 1) New Station Building2) New Unloading/ LoadingPoint3) New IOH shed
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Machilipatnam 1) New Station Building2) New Unloading/ LoadingPoint3) New IOH shed
×

MTM/Mchlptnm
ED/WAG-7 🐅 BHEL made..
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

MTM/Mchlptnm
Pics 1, 2 : huge offlink TATA WAP7 30677 for mtm...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Pics 1,2 : New train boards for kondaveedu expPic 3...
×

07211XX/Kndvd Exprss Spcl MTM/Mchlptnm
Mtm Ypr kondaveedu first end to end run on electric traction...
×

02749/Mchlptnm Bdr MTM/Mchlptnm
Mtm bidr sf exp becomes the first train to run with...
×

12749/Mchlptnm Bdr MTM/Mchlptnm
My dream has come true.SR'S ED WAP-4 22219 with MTM BIDR...
×

12749/Mchlptnm Bdr MTM/Mchlptnm
My dream has come true.SR'S ED WAP-4 22219 with MTM BIDR...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×

MTM/Mchlptnm
Crs inspection double line electrification from gudi vada to machilipatnam ...
×
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy