Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode

For a RailFan, watching MPS skips are far more interesting than watching F1 race - Prince Maan

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Mon May 16 17:30:10 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

MTM/Machilipatnam (2 PFs)
మచిలీపట్నం     मचिलीपट्णम
[Bandaru]

Track: Double Electric-Line

Show ALL Trains
Port Rd., Circlepet , Machilipatnam, Krishna District, Pin- 521001
State: Andhra Pradesh


Zone: SCR/South Central   Division: Vijayawada

No Recent News for MTM/Machilipatnam
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 16
Number of Terminating Trains: 15
0 Follows
Rating: 4.1/5 (31 votes)
cleanliness - good (4)
porters/escalators - average (3)
food - good (4)
transportation - excellent (4)
lodging - excellent (4)
railfanning - good (4)
sightseeing - good (4)
safety - excellent (4)
Show ALL Trains

Station Forum

Page#    Showing 1 to 5 of 145 blog entries  next>>
General Travel
Mar 16 (17:48)   UMD/Osmanabad (2 PFs)
Thorkar AV   10 blog posts
Entry# 5244659            Tags   Past Edits
Bidar Machilipatnam Express should be extended to Latur or Osmanabad. This train stays at Bidar station for 10 to 11 hours. If it is extended to Latur or Osmanabad, it will increase the revenue of the train. In addition, passengers from Latur Osmanabad will be able to connect to Machilipatnam.

7 Posts

44080 views
Apr 07 (13:58)
deepakyerr   2893 blog posts
Re# 5244659-8            Tags   Past Edits
Agree with you SC should be lt under GN quota of extended. As MTM has new built pitline the capacity of the train should be increased to 24 coaches which is pending from many years.

42964 views
Apr 07 (14:06)
Pk
Pavan1003   484 blog posts
Re# 5244659-9            Tags   Past Edits
In mtm old railway station PF caters only 18 to 20 coaches only once new railway station opened in mtm the CC will increase

40410 views
Apr 08 (01:25)
Pk
Pavan1003   484 blog posts
Re# 5244659-10            Tags   Past Edits
Extension not nedded that decidated Train for MTM people

37964 views
Apr 08 (12:26)
Pk
Pavan1003   484 blog posts
Re# 5244659-11            Tags   Past Edits
In 2020 extended proposal sent to railway board but not approved I think SCR dropped the extension proposal

38427 views
Apr 08 (12:38)
Pk
Pavan1003   484 blog posts
Re# 5244659-12            Tags   Past Edits
Not needed Latur & Osmanabad comes under CR railway zone
Info Update
16282 views
May 10 (21:34)   17219/Machilipatnam - Visakhapatnam Express | MTM/Machilipatnam (2 PFs)
saicharankatari
SaiCharan^~   2319 blog posts
Entry# 5340672            Tags   Past Edits
Restoration of mtm vskp mtm express ( earlier mtm vskp mtm passenger)

14 Posts

6311 views
May 11 (08:50)
MTM BZA ELECTRIFIED
BZAItsaBRAND   136 blog posts
Re# 5340672-15            Tags   Past Edits
Ns-bvrm jn demu ni easy ga bvrt varaku tiseukelli akkada passengers nii dinchesi it can came back to bvrm jn.5 minutes halt is not a big problem at bvrt in return any gdv/bza-ns demu can be introduced to pick up vskp-ns passengers, so it can avoid loco reversal at bhimavaram junction.but they may try to run with d loco from bvrm to vskp for this train.

5614 views
May 11 (09:39)
Pk
Pavan1003   484 blog posts
Re# 5340672-16            Tags   Past Edits
Line block avtindi ane cheydam ledu

5199 views
May 11 (15:53)
🔱⚡Lucifer ⚡🔱
Spark   5932 blog posts
Re# 5340672-17            Tags   Past Edits
Instead of such slack keeping rake idle for 9+ hours
Should have extended it to Palasa or Srikakulam
another option Should have made it Morning Intercity between MTM - Vskp - MTM.
Why Bhimavaram need two halts includes LR.

3854 views
May 11 (17:53)
సర్కార్ ఎక్స్ ప్రెస్ 1965
CoringaExpress~   4616 blog posts
Re# 5340672-18            Tags   Past Edits
aina veedu ichina slack ki bvrm enti, NS velli LR cheskuni ravachu :D

3619 views
May 11 (18:57)
Pk
Pavan1003   484 blog posts
Re# 5340672-19            Tags   Past Edits
Ecor path provide cheyile kada extension kosem
General Travel
28053 views
Apr 28 (13:07)   07067/Machilipatnam - Kurnool City Special Fare Special | MTM/Machilipatnam (2 PFs)
Pk
Pavan1003   484 blog posts
Entry# 5327192            Tags   Past Edits
Better to Extend CCT / Vskp Or changed the Timings from MTM to KRNT side...

30 Posts

3819 views
May 07 (18:14)
Ranvir Siddhanth
RanvirSiddhanth~   848 blog posts
Re# 5327192-31            Tags   Past Edits
Should be extended to CCT and Raichur on both sides

3732 views
May 07 (18:18)
Ranvir Siddhanth
RanvirSiddhanth~   848 blog posts
Re# 5327192-32            Tags   Past Edits
BZA-DMM express ki chestunnaru kada and Kurnool lo kuda PF congestion undadu

3650 views
May 07 (18:20)
Pk
Pavan1003   484 blog posts
Re# 5327192-33            Tags   Past Edits
Ohh

2774 views
May 07 (20:05)
Ranvir Siddhanth
RanvirSiddhanth~   848 blog posts
Re# 5327192-34            Tags   Past Edits
Loco reversal for two times.only thing needed is some political push

2773 views
May 07 (20:22)
Pk
Pavan1003   484 blog posts
Re# 5327192-35            Tags   Past Edits
Yes political lobby unte easy ga avtundi le lekapothe piccha lite le
Info Update
May 06 (05:35)   07675/Ernakulam - Machilipatnam Special Fare Exam Special | MTM/Machilipatnam (2 PFs)
saicharankatari
SaiCharan^~   2319 blog posts
Entry# 5335587            Tags   Past Edits
Mtm Ers Mtm RRB Exam Special.
The rake which was earlier planned to restore mtm vskp train now using as mtm ers mtm one trip special. Negotiations are taking place to modify timings of mtm vskp mtm and some primary maintenance issues in mtm led to deferment of this train.

4 Posts

4065 views
May 06 (10:21)
RM of Ongole
Boxerbhai_432~   9489 blog posts
Re# 5335587-5            Tags   Past Edits
Bookings not opened

4024 views
May 06 (10:25)
saicharankatari
SaiCharan^~   2319 blog posts
Re# 5335587-6            Tags   Past Edits
Yes tatkal time kada taravata open avtayemo

3721 views
May 06 (10:32)
Pk
Pavan1003   484 blog posts
Re# 5335587-7            Tags   Past Edits
Yes Cct/ Ns/ MTM nuchi South connection veyacchu weekly / biweekly services
Cct- QLN
Ns - MAQ
MTM - ERS

3537 views
May 06 (10:36)
saicharankatari
SaiCharan^~   2319 blog posts
Re# 5335587-8            Tags   Past Edits
Now opened

3333 views
May 06 (10:36)
RM of Ongole
Boxerbhai_432~   9489 blog posts
Re# 5335587-9            Tags   Past Edits
Only sl bookings opened, 2s not avl so buy gs tkt train will run full empty
Info Update
May 02 (13:46)   MTM/Machilipatnam (2 PFs)
saicharankatari
SaiCharan^~   2319 blog posts
Entry# 5331230            Tags   Past Edits
Mtm vskp mtm express likely to start from may 5 (Thursday) and the likely composition is as follows :
Sleeper - 5 , Second ac -1 , general -7 , Slr - 2 total 15 coaches

14 Posts

7226 views
May 03 (06:01)
saicharankatari
SaiCharan^~   2319 blog posts
Re# 5331230-15            Tags   Past Edits
Idi varku vunna puri / bsp - tpty slot iste bagundedi but till anv varaku train ekkevalaki use avali ane vidanga timings ila plan chesaru anta

6055 views
May 03 (09:13)
deepakyerr   2893 blog posts
Re# 5331230-16            Tags   Past Edits
It will hardly maintain time till Tuni. It will be overtaken by Konark and Falknuma at regupalem and will reach Tuni at 0015-30. Regupalem station is famous for overtakes.

4037 views
May 04 (11:15)
saicharankatari
SaiCharan^~   2319 blog posts
Re# 5331230-17            Tags   Past Edits
restoration of this train now stands postponed

4180 views
May 04 (11:16)
Pk
Pavan1003   484 blog posts
Re# 5331230-18            Tags   Past Edits
Malli endhuku postponed chesaru SCR valla??

3163 views
May 04 (12:33)
utkal andhra
UTTARANDHRARAILSEVA~   1278 blog posts
Re# 5331230-19            Tags   Past Edits
No official Notification from SCR even on 04th May. Proposed Average speed is good for a passenger train. Express tag is added to charge more fare
Page#    Showing 1 to 5 of 145 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy