Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode

Indian Railways: Divided By Zones, United By Railfans - Karthik

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sat May 21 18:59:17 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 1322817-0
Large Station Board;
Entry# 1941271-0

ACLE/Azimganj City (2 PFs)
আজিমগঞ্জ সিটি     आजिमगंज सिटी

Track: Double Electric-Line

Show ALL Trains
Police Station Road, Azimganj, Dist - Murshidabad
State: West Bengal

Elevation: 25 m above sea level
Zone: ER/Eastern   Division: Howrah

No Recent News for ACLE/Azimganj City
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 27
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station Forum

Page#    Showing 1 to 5 of 10 blog entries  next>>
8 Followers
Info Update
★★★
Mar 20 2020 (15:32)   HWH/Howrah Junction (23 PFs)
SAPTARSHI^~   22399 blog posts
Entry# 4597565            Tags   Past Edits
Maximum permissable speed of routes of Eastern Railway #mps /ER

Other updated information (operations)

•Twin Single line section are i) Andal-Pandabeswar & ii) Andal-Topsi
...
more...

•One Train Only (OTO) system section are i) Belur Store Yard-Belur Math, ii) Arambagh-Goghat, iii) Gokulnagar Joypur-Maynapur, iv) Kalyani-Kalyani Simanta v) Jasidih-Baidyanathdham

•For Shantipur-Krishnanagar S/L, train services should run only during day time at 30KMPH strictly due to unmanned L/C (CHC/SDAH)

•MPS over Malda division is 100KMPH

•Sectional speed of Arambagh-Goghat is lowered to 60 Kmph as per T/409 issued in Sept '21.

•Speed Raising in Pandabeswar – Sainthia section: Raising of maximum permissible speed from 90 Kmph to 100 Kmph have been implemented between Pandabeswar - Sainthia (Km.20.34-70.56 from Andal) both UP & DN line updated in Oct 2020. (as per Sr.DOM memo)

•Katwa-Azimganj sectional speed raised from 90 kmph to 100 Kmph for Passenger train only (CWLE-KNSN UP line=90 Kmph, GGLE-KWAE DN line=90 Kmph as per CRS) updated in August 2021. (as per T/409)

•Azimganj cabin-Nalhati UP LINE sectional speed raised from 60Kmph to 80Kmph/100Kmph (as per AOM/Chg dated 03.01.2022)

Ø Enhancement of sectional speed of HOWRAH division-

• from 105kmph to 110kmph in KAN-BDAG Section,
• from 100kmph to 110kmph in BDC-SKG Section
• 50kmph to 70kmph in SKIP-DUMK Section

Ø Further relaxation of Sectional Speed From Existing sanctioned by CRS to Normal Sectional Speed increased in following section
• DBP-RSLR new UP Line From 90kmph to 100kmph
• MUG-KHN new UP Line From 90kmph to 100kmph
• BLY-DKAE new DN Line From 90kmph to 110kmph
• CWLE-KNSN new UP Line From 90kmph to 100kmph
• GGLE-KWAE new DN Line From 90kmph to 100kmph

Ø Enhancement of speed on first loop line - Speed raised from 15kmph to 30kmph in the section of BDC (excluding) to SKG (ex), BWN(ex) to KWAE(ex) and in the Section KWAE(ex)-AMP(ex) on first loop lines.

Ref: Engg. dept statement Dec 2021 of HWH division

Ø Raising of sectional speed for sections:
Krishnanagar City-Lalgola &
Baruipur-Diamond Harbour to 100KMPH
(as per Sr.DOM circular dt.27.04.2022)

•Automatic signal sections are also attached.
i) Auto signal is extended from Ichhapur to Naihati & Shyamnagar station converted from Block station to Flag station.
ii) Auto signal has been extended from Belmuri/Home signal to Cheragram BH/starter (as on June 2021)

• Train Management System (TMS) is started on experimental basis over HWH-BDC & SHE-AMBG section of Howrah division

23 Posts

92964 views
Apr 28 (11:38)
AJ®
amit1407^~   15646 blog posts
Re# 4597565-24            Tags   Past Edits
BGP-DUMK section badly needs speed up. Trial bhi kiya 100km/h ka last Nov me successful bhi raha. April khatam ho raha hai koi speed up nahi kiya ER is section ka

57609 views
May 07 (16:23)
DM
DMail^~   6811 blog posts
Re# 4597565-25            Tags   Past Edits
Can u share Engg department statement?
Modification already done? Or will be done?

May 07 (18:44)
SAPTARSHI^~   22399 blog posts
Re# 4597565-26            Tags   Past Edits
.

53459 views
May 08 (06:20)
Sanaya Rajput
Berational~   625 blog posts
Re# 4597565-27            Tags   Past Edits
Dumka sikaripada ko 50 se 70mps Kia gya h.....
Baaki dumka ke section me koi change hua h ya wahi h old wala ????

However koi benefit nai h (especially Kaviguru) train ki speed up hoga tb na, joki lgta nai h

51037 views
May 08 (10:22)
SAPTARSHI^~   22399 blog posts
Re# 4597565-28            Tags   Past Edits
Any other increase in speed of Dumka sections is not mentioned there... you can fill RTI to get genuine information.
0
updating ...
6 wishes
Happy Journey आपको सदैव हरी झंडी मिलती रहे আপনার যাত্রা শুভ হোক Bon voyage Happy Journey आपको सदैव हरी झंडी मिलती रहे
Time to return home after a wonderful Pelling Trip

261 Posts

FmtBlog
138707 views
Apr 18 (05:00)
Time to hibernate 😶
Deepanjan^~   9938 blog posts
Re# 5303347-262            Tags   Past Edits

FmtBlog
139127 views
Apr 18 (05:01)
Time to hibernate 😶
Deepanjan^~   9938 blog posts
Re# 5303347-263            Tags   Past Edits
@NKG 1 km <--> 1 km @SDAH   6m late
@NKG: Narkeldanga Coaching Yard &4 km/h arrived

FmtBlog
140152 views
Apr 18 (05:02)
Time to hibernate 😶
Deepanjan^~   9938 blog posts
Re# 5303347-264            Tags   Past Edits
@SDAH   7m late
@SDAH: Sealdah &6 km/h

140023 views
Apr 18 (06:04)
Time to hibernate 😶
Deepanjan^~   9938 blog posts
Re# 5303347-265            Tags   Past Edits

140397 views
Apr 18 (06:06)
Time to hibernate 😶
Deepanjan^~   9938 blog posts
Re# 5303347-266            Tags   Past Edits
Loco in charge was Hwh Wap-4 22770
Info Update
1894723 views
Jan 07 2019 (19:36)   53002/Azimganj - Howrah Passenger (UnReserved) | DHAE/Dainhat (4 PFs)
SAPTARSHI^~   22399 blog posts
Entry# 4190101            Tags   Past Edits
➡️ All Notice/engineering events of Barharwa-Azimganj-Katwa BAK Loop (including Katwa-Bandel Line)
.
Engineering blocks on 08/09.01.19 click here

56 Posts

204563 views
Apr 09 (12:58)
SAPTARSHI^~   22399 blog posts
Re# 4190101-57            Tags   Past Edits
Kulik Express will be restored on cancelled days

188929 views
Apr 12 (11:45)
SAPTARSHI^~   22399 blog posts
Re# 4190101-58            Tags   Past Edits
CRS Inspection of Malda division section: New Farakka - Dhulian Ganga new double line (electrified) on 13.04.2022

New Up line : Dhulian Ganga-Ballalpur
New Dn line : Ballalpur-New Farakka bypass cabin
New Common loop
...
more...
line : New Farakka bypass cabin-New Farakka (including)

179782 views
Apr 14 (14:27)
SAPTARSHI^~   22399 blog posts
Re# 4190101-59            Tags   Past Edits
Double line from Dhulianganga station to New Farakka station (Total 15km) has been commissioned on 13.04.22. Speed trial at 122KMPH with nil peak in OMS and got final authorization of 90KMPH speed for new line.

In this project, rail level platform was converted to High level PFs at three stations , provided 3 m wide foot over bridges (FOBs) and one Low Height Subway at Farakka station , 29 Nos Minor bridges, one Major bridge & 3 Nos Yard remodelling .
...
more...
NI of 3 stations parallel to each other was very challenging work. New Farakka is bottle neck of all trains to North east India bcoz there is Farakka Barrage over river Ganga in front of station and there is 3 dimensional traffic in yard due to Y-Leg geometry of yard. Eastern Railway HQ took step forward to do this NI within shortest possible time i.e. 3 day NI in which 19 nos. points & crossing were dismantled and inserted 19 Nos i.e. total 38 Nos.
Commissioner Railway safety (CRS) & PCE/ER appreciated work of construction department such as subway , RUB , station redevelopment , bridges , formation , turfing and Pway work and major bridges etc.

(Collected)

155333 views
Apr 14 (15:04)
IMPROVE BAK LOOP SERVICE
JRLE_KOAA_EXP~   1156 blog posts
Re# 4190101-60            Tags   Past Edits
21rkm double line portion in BAK loop are left now:
1. Jangipur-Sujnipara
2. Bazasau-Chowrigacha

152731 views
Apr 14 (17:15)
Avijit Dutta   178 blog posts
Re# 4190101-61            Tags   Past Edits
Teniya to Bazarsau ekhono baki ache..
Info Update
★★★
Dec 11 2020 (13:53)   53051/Azimganj - Nimtita Passenger (UnReserved) | NILE/Nimtita (3 PFs)
SAPTARSHI^~   22399 blog posts
Entry# 4809520            Tags   Past Edits
CRS Inspection of 'Electrification' of Single line between Rampurhat & Harinsingh was conducted on 10.12.20. (Howrah division)

CRS Inspection of 'Electrification' of Single/Double line between Manigram & Nimtita is conducted on 11.12.20. (Malda division)

2 Posts

373899 views
Feb 14 2021 (19:16)
nobhonil10   2361 blog posts
Re# 4809520-3            Tags   Past Edits
waiting for Kamrup with E Loco

399775 views
Feb 16 2021 (20:48)
SAPTARSHI^~   22399 blog posts
Re# 4809520-4            Tags   Past Edits
Inauguration of Manigram-New Farakka Electrified line, RUB at Malda & Manigram, FOB at Khagraghat Rd., Sujnipara, Basudebpur, Lalbagh Court Rd., Tenya, Dahapara Dham, Niyalispara

by Shri Piyush Goyal,MoR
on 17th February 2021

407979 views
Feb 24 2021 (14:31)
SAPTARSHI^~   22399 blog posts
Re# 4809520-5            Tags   Past Edits
CRS Inspection of 'Electrification' of Single line between Harinsingh & Dumka is conducted on 24.02.21. (Howrah division & Asansol division)

(Collected images)

Mar 16 2021 (10:54)
SAPTARSHI^~   22399 blog posts
Re# 4809520-6            Tags   Past Edits
CRS Inspection of 'Electrification' of Single line between Bhagalpur & Banka is conducted on 16.03.21. (Malda division)

(Collected images)

2 Posts

Feb 24 (13:29)
SAPTARSHI^~   22399 blog posts
Re# 4809520-9            Tags   Past Edits
CRS Inspection of 'Electrification' of Single line between Jasidih & Banka is conducted on 24.02.22. (Asansol division)

(Collected images)
Rail Fanning
602451 views
★★★
Jul 11 2019 (23:53)   63505/Barddhaman - Asansol MEMU | ASN/Asansol Junction (7 PFs)
SAPTARSHI^~   22399 blog posts
Entry# 4375629            Tags   Past Edits
1 compliments
अति सुन्दर 💓💓
Silver Jubilee Celebration (11.07.1994 - 11.07.2019) of MEMU services over Barddhaman Asansol section. This is also the first MEMU service of India.
▪️Proof of trial of MEMU in 1994 is attached.
▪️The MEMU rakes were firstly homed at Howrah Carshed where Major Inspection (IA) was done. Only Trip Inspection (TI) facility was available at Asansol.
▪️Later MEMU Carshed at Asansol was established in
...
more...
the year 1999, with a holding of 30 nos. MCs and 90 nos. TCs with limited maintenance facilities
▪️A few pictures of rakes of CS/ASN is also attached. #mymemories

2 Posts

158998 views
Jan 11 (09:00)
DhnEcr
Sanz~   8210 blog posts
Re# 4375629-3            Tags   Past Edits
The lifeline of Asn-Dgr-Bwn
Page#    Showing 1 to 5 of 10 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy