Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed May 22 22:22:11 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Medium; Platform Pic; Small Station Board;
Entry# 3501278-0
Close-up; Large Station Board;
station pic with shelter
Entry# 4270140-0


VYS/Vyasanakeri (1 PFs)
व्यासनकेरि
ವ್ಯಾಸನಕೇರಿ


Track: Single Electric-Line

Updated: Feb 11 2021 (15:12) by KhagariaJn^~
Show ALL Trains
NH 50 ,Vyasanakeri, Hosapete Taluk,Vijayanagara district -583222
State: Karnataka

Elevation: 515 m above sea level
Type: Regular   Category: n/a
Zone: SWR/South Western   Division: SSS Hubballi (Hubli)


No Recent News for VYS/Vyasanakeri
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 4
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station Forum

Page#    Showing 11 to 14 of 14 blog entries  <<prev  
Info Update
39449 views
14

★★
Dec 16 2015 (20:45)   TBDM/Tungabhadra Dam (1 PFs)
 
~   473 blog posts
Entry# 1680923            Tags   Past Edits
SWR :: Hosapete - Kotturu BG Line
.
Info & Pics by:- ದೀಪಕ್ ಎಸ್. ಉಳ್ಳಿ @ Karnataka Railway News & Developments @ Facebook Page
.
This post is on hosapete - kotturu
...
more...
(hpt-kty) line of swr ..wic is operating only for freight train not opened for passenger train due to gradient constient ..last month GM of SWR said work is going on will b completed within 5 months & it ll b open for passenger by next march .. so i decided to check on going work of this line wic is just half km away from my house.. length of hpt - kty line is (0.0- 70.0 km) ..mainly gradient constient problem lies btn vyasanakere st to gunda rd st (10.0km-19.5km)
pic1: where i started my journey near t.b dam st
pic2,3,4,5: T.B dam st wic just 5km away frm main hpt jn
i asked station master Mr Rajesh about this work & he said all work up to this st frm hpt st is completed ..he said one imprt thing that their is proposal form railway board to close the T.B DAM st ,if passenger train not run in next few months
pic 6:shows minor work @ t.b dam also u can see bridge of NH13
pic7: straight track line on mountain ever elevation will begins
pic 8: imp one u can see their is a rly crossing pt below this NH13 tunnel passes ..
pic 9: diagram of rly crossing
pic 10: track lies above the tunnel it has come down by 6 ft to solve this first gradient constient but their is objection by NHAI stated that if track comes down by 6ft it may damage tunnel hence work is stopped here
pic 11 : shows Reserve tungabhadra dam water, NH13 road connecting solapur - magaluru & beside hpt-kty line
pic 12: where iron ore material gets loaded in train ..
pic 13&14 : vyasanakere st the main problem starts from this st to gunda jn however i could not able to travel on this track becz station master warned me not walk along track due to huge thick forest & presences wild animal like cheetah ther so i stop & walked along rd reach M.M halli (22.2km)
pic 15&16: M.M halli st this st is like cremation ground no one is their here not even station master
pic 17&18 : M.M halli old office & old closed ticket counter
pic 19 : another rly crossing @ m.m halli but no gates placed to stop vehicles becz no train passes here not even freight trains next i traveled towards gunda jn

pic 20,21&22: gunda jn st here also same thing as M.M halli st no station master ..station has to be get reconstructed or re innovated
pic 23: pt where left side track takes swamy halli route & right side one towards kottur

final pic 24: @ gunda st work
Conclusion : main gradient work going btn vyasanakere& gunda jn also signal installation & other work even if work completes by next march .. but still renovation of stations work of M.M halli & gunda jn need to start ..i hope they do on time
Info & Pics by:- ದೀಪಕ್ ಎಸ್. ಉಳ್ಳಿ @ Karnataka Railway News & Developments @ Facebook Page

Translate to English
Translate to Hindi

More Posts
Pic Upload
16569 views
4

Jun 07 2018 (16:28)   VYS/Vyasanakeri (1 PFs)
DeepakUlli~
DeepakUlli~   2929 blog posts
Entry# 3501278            Tags  
#stationboard vyasanakeri ..present station board not looking good so changing it .
Translate to English
Translate to Hindi

More Posts
General Travel
5136 views
6

Jul 31 2014 (11:34)   VYS/Vyasanakeri (1 PFs)
 
docdiablo~
docdiablo~   1318 blog posts
Entry# 1174733            Tags   Past Edits
A freight stands amidst a thick green cover of hills in the background, and an example of indiscriminate mining in the foreground, at Vyasanakeri.
1st pic as #SB if suitable
Translate to English
Translate to Hindi
General Travel
18602 views
3

Dec 13 2014 (00:19)   VYS/Vyasanakeri (1 PFs)
 
docdiablo~
docdiablo~   1318 blog posts
Entry# 1305974            Tags  
For #SB.
Had posted similar pic vide entry #1174733, but there were 2 pics. Hence, this time with 1 pic.
Translate to English
Translate to Hindi

More Posts
Page#    Showing 11 to 14 of 14 blog entries  <<prev  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy