Requested our PM,FM,RM and Railway Board that Instead of going for semi high speed track 160 to 200 km / hour in our IR ,The existing tracks have to be strengthened for all weather conditions sustainable operations of 130 km/ hour. .
In the heavy rainy areas ,Soil erosion areas and land sliding areas necessary RCC protecting wall structures have to be provided with proper drainage arrangement.