Mumbai CR and WR should be utilized the existing track areas effectively.Since no more tracks are permitted in augmentation in the ground level because of huge land cost and highly difficult to acquire lands in the Metros especially in the adjacent area of the existing track.
So CR and WR have to be constructed additional tracks over the existing track areas as Over Head Elevated tracks.
This is the only possible solution for the future expansion of additional Railway Tracks in all the Metros.