Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Oct 10 08:35:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
ndls

7128/Σ Amritsar ahmedabad ΣChain


Created: Jul 29 2012 (17:26) by guest

Change Departure Station:
Change Arrival Station:

10
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 1 to 5 of 756 blog entries  next>>
Info Update
1608355 views
6

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   576 blog posts
Entry# 6143019            Tags   Past Edits
2 compliments
Agree Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced wnd cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that my post don't get archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can see that whether this coach composition for train sets will become a successful idea or will become a flop idea.

Translate to English
Translate to Hindi

More Posts
0
updating ...
7 wishes
Happy Journey HJ Happy Journey HJ Happy Journey Happy Journey আপনার যাত্রা শুভ হোক
Now it's time to return home after a wonderful Himachal Trip. First ride in this train.

FmtBlog
701 views
0

Oct 01 (08:57)
Deepanjan^~
Deepanjan^~   17231 blog posts
Re# 6205786-1            Tags  
Left pf 4 at 8:52
Translate to English
Translate to Hindi

5 Posts

FmtBlog
1211 views
1

Oct 01 (09:25)
Deepanjan^~
Deepanjan^~   17231 blog posts
Re# 6205786-7            Tags  
@UMB: Ambala Cantt Jn   0km/h  
12014 was at pf 4
Translate to English
Translate to Hindi

More Posts
Rail News
17099 views
0

Major Accidents/Disruptions
NR/Northern
Sep 29 (19:35)   Train Delays Expected in Uttar Pradesh due to Block on Rail Lines

Exynos9611~   21223 news posts
Entry# 6204733         Tags   Past Edits
Railway News: मुरादाबाद-दिल्ली और गोरखपुर-गोंडा रेलखंड पर ब्लॉक, आठ ट्रेनें होंगी प्रभावित

On October 1st, three trains, including the Bagh Express which runs via Bareilly, will be affected due to a block on the Gorakhpur-Gonda rail line at the Magahar station. In addition, four trains, including the Lucknow-Anand Vihar Double Decker Express, will be delayed by four hours due to a block on...
more...
the Moradabad-Delhi rail line.

1st October ko, Gorakhpur-Gonda rail line pe Magahar station pe block ki wajah se, Bagh Express, jo Bareilly se hoke jaati hai, yeh samit teen train affect hongi. Iske alawa, Moradabad-Delhi rail line pe block ki wajah se, Lucknow-Anand Vihar Double Decker Express samit chaar train, chaar ghanta tak late chalengi.
General Travel
14843 views
3

Sep 28 (07:55)   14311/Ala Hazrat Express (via Mahesana) | BHUJ/Bhuj (3 PFs)
OmGaneshaynamah~
OmGaneshaynamah~   80 blog posts
Entry# 6203435            Tags   Past Edits
इलेक्ट्रिक इंटरलॉकिंग कार्य के कारण रेल यातायात प्रभावित
Translate to English
Translate to Hindi

8363 views
2

Sep 29 (05:40)
OmGaneshaynamah~
OmGaneshaynamah~   80 blog posts
Re# 6203435-1              
आज गांधीधाम तक जाएगी आलाहजरत
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 756 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy