Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Oct 5 21:35:16 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
via mrwar

12479/Σ kathgodam bandra ΣChain


Created: Jan 12 2013 (13:04) by guest

Change Departure Station:
Change Arrival Station:

06
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 11 to 15 of 842 blog entries  <<prev  next>>
Rail News
32890 views
0

Major Accidents/Disruptions
NWR/North Western
Jun 13 (19:28)   Train Services Affected in Haryana: Partial Cancellation and Regulation on June 16th

Exynos9611~   20891 news posts
Entry# 6094206         Tags   Past Edits
हरियाणा में रेल यातायात प्रभावित:ब्रिज निर्माण के कारण एक ट्रेन आंशिक रद्द, दूसरी रेगुलेट रहेगी, ऋषिकेश एलएचबी रैक से चलेगी

Two trains operating through Haryana will be affected on June 16th due to maintenance work on the track. Train number 19618, Rewari-Madar Junction, will be partially cancelled, operating only between Rewari and Phulera. Train number 22452, Chandigarh-Bandra Terminus, will be regulated at Phulera station for 1 hour. Meanwhile, the railway administration...
more...
has decided to operate the Barmer-Rishikesh and Rishikesh-Shri Ganganagar-Rishikesh Express trains with LHB coaches for passenger comfort. Train number 14888/14887, Barmer-Rishikesh Express, will operate with LHB coaches from Barmer on June 16th and from Rishikesh on June 18th. Train number 14816/14815, Rishikesh-Shri Ganganagar Express, will operate with LHB coaches from Rishikesh on June 17th and from Shri Ganganagar on June 18th. Both trains will have 15 coaches, including 1 AC First Class, 4 AC Third Class, 4 Second Sitting, 4 General Class, 1 Power Car, and 1 Guard Class.

Haryana se jaane wali do trains pe 16 June ko impact padega, track maintenance ki wajah se. Train number 19618, Rewari-Madar Junction, partially cancel ho jaayegi, Rewari se Phulera tak chalegi. Train number 22452, Chandigarh-Bandra Terminus, Phulera station pe 1 hour regulate rahegi. Iske sath hi, railway administration ne Barmer-Rishikesh aur...
more...
Rishikesh-Shri Ganganagar-Rishikesh Express trains ko LHB coaches se chalaane ka decision liya hai, passenger comfort ke liye. Train number 14888/14887, Barmer-Rishikesh Express, 16 June se Barmer aur 18 June se Rishikesh se LHB coaches se chalegi. Train number 14816/14815, Rishikesh-Shri Ganganagar Express, 17 June se Rishikesh aur 18 June se Shri Ganganagar se LHB coaches se chalegi. Dono trains mein 15 coaches honge, including 1 AC First Class, 4 AC Third Class, 4 Second Sitting, 4 General Class, 1 Power Car, and 1 Guard Class.
Rail News
27184 views
0

IR Affairs
Jun 12 (19:58)   Train Route Change Due to Underpass Construction in Ajmer

Exynos9611~   20891 news posts
Entry# 6093272         Tags   Past Edits
(बड़ी खबर) इस दिन से रानीखेत एक्सप्रेस ट्रेन चलेगी परिवर्तित मार्ग से,यात्री रहे अपडेट।।

Due to the construction of an underpass between Ajmer and Daurai stations on the Ajmer Division of North Western Railway, the route of train number 15014/25014, the Kathgodam/Ramnagar-Jaisalmer Express, scheduled to run on June 13, 2023, has been changed. The train will now follow a different route: Phulera-Medta Road-Jodhpur instead of...
more...
the original route of Rewari-Alwar-Jaipur-Phulera-Ajmer-Marwar-Jodhpur. It will stop at Phulera, Degana, and Medta Road stations on this changed route.

North Western Railway ke Ajmer Division pe Ajmer aur Daurai station ke beech underpass banne ki wajah se, 13 June, 2023 ko chalne wali 15014/25014 Kathgodam/Ramnagar-Jaisalmer Express ka route change ho gaya hai. Train ab Rewari-Alwar-Jaipur-Phulera-Ajmer-Marwar-Jodhpur ki jagah Phulera-Medta Road-Jodhpur se jayegi. Is route pe train Phulera, Degana aur Medta Road...
more...
station pe rukengi.
Rail News
49044 views
0

IR Affairs
May 31 (20:05)   Train Route Diversions and Delays in India Due to Construction and Traffic Issues

Exynos9611~   20891 news posts
Entry# 6080917         Tags   Past Edits
गर्मियों की छुट्टियों में बना रहे हैं उत्तराखंड जाने का प्लान, काठगोदाम जाने वाली ट्रेनों के रूट्स डायवर्ट, देखें शेड्यूल

Due to construction work between Kishangarh and Mandavaria stations on the North Western Railway, several train routes have been diverted. The Kathgodam-Jaisalmer Express trains (15014/25014 and 15013/25013) operating on 8th, 9th, 15th, and 16th June 2024 have changed routes and will stop at several additional stations. Additionally, the Anand Vihar Terminal-Kamaख्या...
more...
Express (15622) will be delayed by 120 minutes on June 1st, 2024 due to traffic and power blocks on the Khalilabad-Magahar section. The Jammu Tawi-Barauni Express (12492) will be delayed by 110 minutes and the Kochuveli-Gorakhpur Express (12512) by 25 minutes on June 1st, 2024.

North Western Railway pe Kishangarh aur Mandavaria stations ke beech construction work chal raha hai, is wajah se kaafi train routes divert kiye gaye hain. Kathgodam se Jaisalmer jaane wali Express trains (15014/25014 aur 15013/25013) jo 8th, 9th, 15th aur 16th June 2024 ko chalti hain, unka route change ho gaya...
more...
hai aur woh kuchh aur stations pe rukengi. Iske alawa, Anand Vihar Terminal se Kamaख्या jaane wali Express (15622) 1st June 2024 ko Khalilabad-Magahar section pe traffic aur power blocks ki wajah se 120 minutes late chalegi. Jammu Tawi se Barauni jaane wali Express (12492) 110 minutes aur Kochuveli se Gorakhpur jaane wali Express (12512) 25 minutes late chalegi 1st June 2024 ko.
Rail News
28077 views
0

IR Affairs
NWR/North Western
May 28 (20:04)   Mandor Superfast and Ranikhet Express Trains to Operate on Modified Routes Due to Jaipur Railway Station Redevelopment

Exynos9611~   20891 news posts
Entry# 6078210         Tags   Past Edits
29 मई से 71 दिन जयपुर नहीं जाएगी मंडोर सुपरफास्ट और रानीखेत एक्सप्रेस, जानिए क्या है वजह

Due to redevelopment work at Jaipur Railway Station, the Mandor Superfast (train number 22996/95) and Ranikhet Express (train number 15014/13) will be operating on a modified route from May 29th to August 7th, 2023. The Mandor Superfast will operate via Phulera-Ringas-Rewari instead of the usual Phulera-Jaipur-Alwar-Rewari route. The Ranikhet Express will...
more...
operate via Rewari-Ringas-Phulera instead of the usual Rewari-Alwar-Jaipur-Phulera route. This change is due to construction of the air concourse foundation on platforms 4 and 5, which is expected to last for 88 days, from May 12th to August 7th. Other trains between Jodhpur and Jaipur will operate as usual.

Jaipur Railway Station pe re-development ka kaam chal raha hai, is wajah se Mandor Superfast (train number 22996/95) aur Ranikhet Express (train number 15014/13) 29 May se 7 August tak badla hua route se chalengi. Mandor Superfast Phulera-Ringas-Rewari route se chalegi, normal Phulera-Jaipur-Alwar-Rewari route ki jagah. Ranikhet Express bhi Rewari-Ringas-Phulera route...
more...
se chalegi, normal Rewari-Alwar-Jaipur-Phulera route ki jagah. Ye change platforms 4 aur 5 pe air concourse foundation ke construction ke wajah se hai, jo ki 12 May se 7 August tak, 88 din tak chalta rahega. Jodhpur aur Jaipur ke beech chalne wali aur trains normal tarah se chalengi.
Rail News
26199 views
0

IR Affairs
NWR/North Western
May 28 (20:04)   Diverted Train Routes in Rajasthan due to Jaipur Station Redevelopment

Exynos9611~   20891 news posts
Entry# 6078209         Tags   Past Edits
29 मई से 71 दिन जयपुर नहीं जाएगी मंडोर सुपरफास्ट और रानीखेत एक्सप्रेस, जानिए क्या है वजह

Due to redevelopment work at Jaipur Railway Station, the Mandore Superfast (train no. 22996/95) and Ranikhet Express (train no. 15014/13) will be operating on diverted routes from May 29th to August 7th, 2023. The Mandore Superfast will run via Phulera-Ringas-Rewari instead of the usual Phulera-Jaipur-Alwar-Rewari route. The Ranikhet Express will run...
more...
via Rewari-Ringas-Phulera instead of Rewari-Alwar-Jaipur-Phulera. Both trains will not be stopping at Jaipur during this period. This diversion is due to foundation work for the air concourse on platforms 4 and 5, which will last from May 12th to August 7th, affecting train operations. Other trains between Jodhpur and Jaipur will operate as usual.

Jaipur Railway Station pe re-development ka kaam chal raha hai, is wajah se Mandore Superfast aur Ranikhet Express train, 29 May se 7 August tak, diverted route se chalengi. Mandore Superfast, Phulera-Jaipur-Alwar-Rewari ke bajaye, Phulera-Ringas-Rewari se chalegi. Ranikhet Express, Rewari-Alwar-Jaipur-Phulera ke bajaye, Rewari-Ringas-Phulera se chalegi. Dono trains is duration mein...
more...
Jaipur nahi jaayengi. Platforms 4 aur 5 pe air concourse ke foundation ka kaam 12 May se 7 August tak hai, is wajah se train operations affect hui hain. Jodhpur aur Jaipur ke beech chalne wali aur trains, normal schedule se chaliengi.
Page#    Showing 11 to 15 of 842 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy