Nope , they have managed to run the AC partially by drawing power from B2 coach, NDLS AC staff is on board for any assistance if required, Coach replacement would have taken around 3-4 hrs so they decided to go with this coach only, plus this is already a replacement coach as the original coach had a cracked wheel