Finally!! Got up early and planned a short trip to Rewari to providing you latest updates on RE-MHU-HSR #Electrification & #Doubling.
Board train : 54835 (HSR-RE PXGR)
Return Board train :59721 (JP-HSR FAST PXGR)
Highlights : ( Statics are in % & acc to my data )
тЧЖтЧЖDoubling...
more... тЧПRE-KSI work almost done 99% including track laying,linking and signalling. 1% remainedmained for track linking.
тЧПKSI-MHU work for track laying & linking is done almost 60%.Levelling work done 80%.Remaining work left 20%.
тЧЖтЧЖтЧЖOverall work done 65-70%
тЧЖтЧЖElectrification
тЧПRailway is setting up TSS at STD & RE
тЧПRE-KSI work for pole basic structure is complete on both side (up-dwn) . Pole erected 70%.
тЧПKSI-MHU work for pole basic structure is in progress
тЧПMHU-HSR work for pole basic structure completed till Hansi (HNS) (50KM).
Pole have been erected from MHU to in between BWK-JKZ (35KM).
Wiring & OHE Eqip have been completed till BWN (14KM)
тЧПтЧПWork for Plateforms including increase in height and 2nd platefrom are in progress till BWK.
KSI will now have 3 Plateforms currently only have single.
тЧПтЧП Today i saw heavy load on RE-HSR track met with 10 WDG with 10 different Goods and Coal train
тЧЖтЧЖтЧЖ IMP NEWS: RAILWAY is CONSTRUCTES A BY-PASS LINE TO IGNORE REWARI UNDER WDFC WHICH CONNECT RE-HSR SECTION TO RE-FL SECTION UNDER WDFC. A GREAT RELIEF !! (this is not confirmed news ...but i am informing you as i saw rly constructing bridge and other work just 10km before rewari on HSR-RE section)
Today's Blog Upload
тЧПDoubling
тЧПElectrification
тЧПHSR-RE Pxgr - 54835
тЧПJP-HSR Fast Pxgr - 59721
тЧПDEE-BDTS GR - 12215
тЧПBDTS-DEE GR - 12216
тЧПSLN-ADI Exp - 19404
тЧПVARIOUS WDG LOCO PICS
тЧПVarious Station pics
#Hisar