Linking of BG track & turnout, Provision of glued joint & SEJ, dismantling of existing track & turnouts, handling , lifting, loading, unloading and spreading of ballast, leading of P. Way materials and other misc. work, Fabrication, supplying & fixing in position Galvanized Steel Channel Sleepers and Alumino Thermit welding of 60 kg 90 UTS rails and combination joint with single shot crucible SKV process in c/w Rohtak-Meham New Line work (Km 5/200 to Km 37/500) and Shifting of Rohtak-Gohana-Panipat Line out of Rohtak City Elevated Portion (Km 0.800 to Km 5.650) in connection with New Line between Rewari-Rohtak.