can anyone throw some light on the progress of guage conversion of palghat -pollachiand schenkottah- thenmala sections. I wonder why the IR is slack towards a near heritage sector of thenmala-schekottah rail. IR should also think of connecting punalur with sabari rail line ending at erumeli on the southern side.