Out of the 24 coaches imported from Germany, all of them mostly being Air Conditioned chair cars, the first lot were used for New Delhi-Lucknow Shatabdi Express on a trial basis. It didn't turn out be successful as the coaches' wide windows were targets of mischief and stone-pelting. Railways had to use sealing tapes to tape up the bruised windows. When these rakes were brought into service, couplers came unstuck and the data collected from the passenger feedback showed that the air conditioning was not "very effective". They were withdrawn from service and after attending to the problems, Railways reintroduced them on the New Delhi-Lucknow Shatabdi Express and proved successful.