बक्सर में 13 कोच लेकर दौड़ा इंजन, 9 पीछे छूटे:कपलिंग टूटने से मगध एक्सप्रेस दो हिस्से में बंटी; पायलट ने इमरजेंसी ब्रेक लगाकर रोकी ट्रेनOn Sunday afternoon, the Magadh Express train, travelling from Dumraon to Islampore, experienced a coupling failure between Raghunathpur and Tudiganj, causing the train to split into two sections. The incident occurred at around 11:07 AM near Dharaoli Halt on the Howrah-Delhi rail route. Though the incident caused a scare among passengers,...
more... no casualties were reported. The train's engine and 13 coaches moved forward, while 9 coaches remained behind. The train came to a halt approximately 70 meters ahead. Train operations on the affected section were halted. The train, numbered 20802, had departed Dumraon station at 11:00 AM and was carrying 22 coaches, including AC and sleeper coaches, as well as general and disability compartments. The incident occurred just 7 minutes after the train's departure from Dumraon station. The incident triggered a response from the railway authorities, with the Railway Protection Force deploying a team to the scene. The front section of the train was brought to Raghunathpur station, while the rear section remained on the track.
Sunday dopahar ko, Dumraon se Islampore ja rahi Magadh Express train, Raghunathpur aur Tudiganj ke beech, coupling tutne se do hisso mein bant gayi. Yeh incident Howrah-Delhi rail route par Dharaoli Halt ke paas, takreeban 11:07 AM par hua. Train mein yaatriyon mein ghabrahat ho gayi, par koi casualty nahin hua....
more... Engine aur 13 coach aage badh gaye, aur 9 coach peeche reh gaye. Train, takreeban 70 meter aage chal kar ruk gayi. Is incident ke baad is rail section par chalne wala traffic band ho gaya. Train, number 20802, Dumraon station se 11:00 AM par chali thi aur ismein 22 coach the, jinmein AC aur sleeper coach, general aur disability compartment bhi the. Incident, Dumraon station se chalne ke sirf 7 minute baad hua. Incident ke baad railway authorities ki taraf se response aaya, aur Railway Protection Force ne scene par team deploy ki. Train ka aage ka hissa Raghunathpur station laaya gaya, aur peeche ka hissa track par hi raha.