62.12 Crs.
Expenditure till date- 41.23 Crs
Overall physical progress- 45%
Scope of work-
Phase I-
тЮбя╕ПExtension of Platform No. 10/11 from current 298 meter to Proposed 680 meter.
тЮбя╕ПRemoval of 30 OHE masts & portals and it's relocations
тЮбя╕ПRemoval of 37 Signalling and telecom obstructions and it's relocations
тЮбя╕ПDismantling of 9 old washing pit lines, stabling sidings.
тЮбя╕ПDismantlings of 18 turnouts
тЮбя╕ПInsersion of 13 turnouts
тЮбя╕ПDismantling and linking of plain track of 1.5 Km length
Phase II -
Scope of work -
тЮбя╕ПExtension of Platform No. 12/13/14 from existing 385 meter to 690 meter
тЮбя╕ПRemoval of 31 OHE masts & portals and its relocation
тЮбя╕ПRemoval of 34 signalling and telecom obstruction and it's relocations
тЮбя╕ПDismantling of 7 old track turnouts and insertion of 1 new turnout.
тЮбя╕ПDismantling and linking of plain track 0.5 Km length
тЬЕCompleted works-
тЬЕDismantling of existing Carnac bunder ROB
тЬЕObject controller rooms completed.
тЬЕSub station building 25 x 5.5 meter
тЬЕLaying and linking of track to a length of 2 km completed for it's connection to existing lines
тЬЕConstruction of New RRI Route Relay Interlocking building (G+3) of 34 mtr*8.5 mtr
Completion of these 5 platform extensions will improve mobility of trains in busy CSMT-Dadar section.
please wait...Translate to EnglishAdmin and Moderator Source Cr X Handle. Please update it.
CRInfraupdates. CSMT Platform no. 10/11/12/13/14 will be extended to 24 coach length from the current 12/18 coach length. The cost is 62.12 Crs. The expenditure till date is 41.23 Crs. Overall physical progress is 45%.
Scope of work for Phase I:
- Extension of Platform No. 10/11 from 298 meters to proposed 680 meters.
- Removal of 30 OHE masts and portals and relocating them.
- Removal of 37 signalling and telecom obstructions and relocating them.
- Dismantling 9 old washing pit lines and stabling sidings.
- Dismantling 18 turnouts.
- Installing 13 turnouts.
- Dismantling and linking a plain track of 1.5 km length.
Phase II:
Scope of work:
- Extension of Platform No. 12/13/14 from 385 meters to 690 meters.
- Removal of 31 OHE masts and portals and relocating them.
- Removal of 34 signalling and telecom obstructions and relocating them.
- Dismantling 7 old track turnouts and installing 1 new turnout.
- Dismantling and linking a plain track of 0.5 km length.
Completed works:
- Dismantling of existing Carnac bunder ROB.
- Object controller rooms are completed.
- Sub station building of 25 x 5.5 meters.
- Laying and linking of track to a length of 2 km completed for its connection to existing lines.
- Construction of new RRI Route Relay Interlocking building (G+3) of 34 mtr*8.5 mtr.
Completing these 5 platform extensions will improve train mobility in the busy CSMT-Dadar section.