Idiocity at its peak. Instead of giving a new dedicated train, GODA-SDAH may be a link express type train. AFAIK, This may be going 2 happen.
12378:- NOQ 17.15; 18 NCB 17.33/38; 144 NJP 19.35/50; 231.3 KNE 21.02/04; 379 MLDT 23.50/59; 504 RPH 02.20/45; 564.5 BHP 03.43/45; 616.5 BWN 04.53/55; 718.5 SDAH 06.45| 719 kms in 13 hrs 30 mins @ 53 kph. 13478:- GODA 23.15; 16.5 PYHT 23.33/35; 31.9 HSDA 23.51/53; 60 BRPS 00.25/27; 74 DUMK 00.45/50; 138 RPH 02.05/45; 198.5 BHP 03.43/45; 250.5 BWN 04.53/55; 352.5 SDAH 06.45| 353 kms in 7 hrs 30 mins @ 47 kph.
12377:-...
more... SDAH 23.20; BWN 00.50/52; BHP 01.44/46; RPH 02.45/03.10; MLDT 05.25/35; KNE 07.50/52; NJP 09.20/35; NCB 11.51/56; NOQ 12.20| 719 kms in 13 hrs @ 55 kph. 13477:- SDAH 23.20; BWN 00.50/52; BHP 01.44/46; RPH 02.45/03.20; DUMK 04.35/40; BRPS 04.56/58; HSDA 05.30/32; PYHT 05.48/50; GODA 06.10| 353 kms in 6 hrs 50 mins @ 52 kph.