Wonder why SR is not operating trains via SA-KRR.. the route is ready and operational. Safety checks are over and goods trains are running. Still SR does all the spl trains via SA-ED-TPJ, with loco change at ED. That will drastically reduce the running time of these trains and poor Southern TN people..